Mikhail Tcibulskii, Ivan Trofimenko, Marat Yagudin, A. Lodin, Vladimir Khohryakov
{"title":"首次在阿联酋巨型碳酸盐岩海上油田部署生产系统优化工具,为数字化油田奠定基础","authors":"Mikhail Tcibulskii, Ivan Trofimenko, Marat Yagudin, A. Lodin, Vladimir Khohryakov","doi":"10.2523/iptc-22040-ms","DOIUrl":null,"url":null,"abstract":"\n Lost circulation (LC) is commonly encountered in drilling and cementing operations and can significantly contribute to non-productive time (NPT). An operator in the Kyumbinskoe Field faced this challenge in a fractured production section of the formation, and conventional LC solutions had been ineffective at achieving strict regulatory top of cement (TOC) requirements and satisfactory cement bonding. This paper describes the experience of utilizing foam cementing technology as a primary solution to solve a lost circulation issue on the project. For this project a foam cementing solution was designed to meet operational parameters for cementing a production casing in one stage (multi-stage tool was eliminated).\n Use of foam cementing technology helped to minimize losses experienced in all cementing operations previously on this project. CBL results were also improved. All Customer requirements were met: Planned Top Of Cement (TOC)Minimum losses during cementing operationsRig time savingImproving CBL results.","PeriodicalId":10974,"journal":{"name":"Day 2 Tue, February 22, 2022","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2022-02-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"First Ever Deployment of Production System Optimization Tool in Giant Carbonate Offshore Field in UAE - Laying the Foundation for Digital Oil Field\",\"authors\":\"Mikhail Tcibulskii, Ivan Trofimenko, Marat Yagudin, A. Lodin, Vladimir Khohryakov\",\"doi\":\"10.2523/iptc-22040-ms\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n Lost circulation (LC) is commonly encountered in drilling and cementing operations and can significantly contribute to non-productive time (NPT). An operator in the Kyumbinskoe Field faced this challenge in a fractured production section of the formation, and conventional LC solutions had been ineffective at achieving strict regulatory top of cement (TOC) requirements and satisfactory cement bonding. This paper describes the experience of utilizing foam cementing technology as a primary solution to solve a lost circulation issue on the project. For this project a foam cementing solution was designed to meet operational parameters for cementing a production casing in one stage (multi-stage tool was eliminated).\\n Use of foam cementing technology helped to minimize losses experienced in all cementing operations previously on this project. CBL results were also improved. All Customer requirements were met: Planned Top Of Cement (TOC)Minimum losses during cementing operationsRig time savingImproving CBL results.\",\"PeriodicalId\":10974,\"journal\":{\"name\":\"Day 2 Tue, February 22, 2022\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-02-21\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 2 Tue, February 22, 2022\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2523/iptc-22040-ms\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 2 Tue, February 22, 2022","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2523/iptc-22040-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
First Ever Deployment of Production System Optimization Tool in Giant Carbonate Offshore Field in UAE - Laying the Foundation for Digital Oil Field
Lost circulation (LC) is commonly encountered in drilling and cementing operations and can significantly contribute to non-productive time (NPT). An operator in the Kyumbinskoe Field faced this challenge in a fractured production section of the formation, and conventional LC solutions had been ineffective at achieving strict regulatory top of cement (TOC) requirements and satisfactory cement bonding. This paper describes the experience of utilizing foam cementing technology as a primary solution to solve a lost circulation issue on the project. For this project a foam cementing solution was designed to meet operational parameters for cementing a production casing in one stage (multi-stage tool was eliminated).
Use of foam cementing technology helped to minimize losses experienced in all cementing operations previously on this project. CBL results were also improved. All Customer requirements were met: Planned Top Of Cement (TOC)Minimum losses during cementing operationsRig time savingImproving CBL results.