钼矿选矿可行性研究的经济评价研究

Seong-Young Nam, Jang-hoon Roh, Ye-Jin Yang, Namil Um, Ji-Whan Ahn, Jin Kim
{"title":"钼矿选矿可行性研究的经济评价研究","authors":"Seong-Young Nam, Jang-hoon Roh, Ye-Jin Yang, Namil Um, Ji-Whan Ahn, Jin Kim","doi":"10.4144/RPSJ.61.10","DOIUrl":null,"url":null,"abstract":"In the development of mines, risk is latent in a variety of areas. Thus a feasibility study was conducted to determine certain risks. In particular, mineral processing for the recovery of a target mineral constitutes a very large percentage of the cost from the start of a project, and it is an important step in relation to the recovery of funds. In this study, a feasibility study of molybdenum mineral processing is done and comparisons are made between a pilot plant and a commercial plant using the LCCA evaluation method. At the pilot plant, the NPV value of a deterministic approach at five years is $68,984 and the probability that the NPV exceeds 0 is 58.23% according to Monte Carlo simulation done using a probabilistic approach. At the commercial plant, the NPV value with the deterministic approach at five years is –$10,820,473, and it was found that the probability of NPV according to deterministic estimation is 49.91% in a Monte Carlo simulation. As a result, the commercial plant is evaluated as experiencing a loss due to a decrease in the molybdenum concentrate price, whereas a price increase of 20% relative to the current molybdenum concentrate price can meet the margin after five years when the NPV exceeds over 0.","PeriodicalId":20971,"journal":{"name":"Resources Processing","volume":"72 1","pages":"10-20"},"PeriodicalIF":0.0000,"publicationDate":"2014-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"A Study on the Economic Evaluation for a Feasibility Study in Molybdenum Mineral Processing\",\"authors\":\"Seong-Young Nam, Jang-hoon Roh, Ye-Jin Yang, Namil Um, Ji-Whan Ahn, Jin Kim\",\"doi\":\"10.4144/RPSJ.61.10\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In the development of mines, risk is latent in a variety of areas. Thus a feasibility study was conducted to determine certain risks. In particular, mineral processing for the recovery of a target mineral constitutes a very large percentage of the cost from the start of a project, and it is an important step in relation to the recovery of funds. In this study, a feasibility study of molybdenum mineral processing is done and comparisons are made between a pilot plant and a commercial plant using the LCCA evaluation method. At the pilot plant, the NPV value of a deterministic approach at five years is $68,984 and the probability that the NPV exceeds 0 is 58.23% according to Monte Carlo simulation done using a probabilistic approach. At the commercial plant, the NPV value with the deterministic approach at five years is –$10,820,473, and it was found that the probability of NPV according to deterministic estimation is 49.91% in a Monte Carlo simulation. As a result, the commercial plant is evaluated as experiencing a loss due to a decrease in the molybdenum concentrate price, whereas a price increase of 20% relative to the current molybdenum concentrate price can meet the margin after five years when the NPV exceeds over 0.\",\"PeriodicalId\":20971,\"journal\":{\"name\":\"Resources Processing\",\"volume\":\"72 1\",\"pages\":\"10-20\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2014-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Resources Processing\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.4144/RPSJ.61.10\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Resources Processing","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4144/RPSJ.61.10","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

在矿山开发过程中,风险潜伏在各个方面。因此进行了可行性研究,以确定某些风险。特别是,为回收目标矿物而进行的矿物加工从项目开始时起就占费用的很大比例,这是回收资金的一个重要步骤。本文采用LCCA评价方法,对钼矿选矿进行了可行性研究,并对中试厂和商业厂进行了比较。在试验工厂,确定性方法在五年的NPV值为68,984美元,根据使用概率方法进行的蒙特卡罗模拟,NPV超过0的概率为58.23%。在商业工厂,采用确定性方法的五年NPV值为- 10,820,473美元,在蒙特卡罗模拟中发现,根据确定性估计的NPV概率为49.91%。因此,商业工厂被评估为由于钼精矿价格下降而遭受损失,而相对于当前钼精矿价格上涨20%可以在五年后NPV超过0时满足边际利润。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
A Study on the Economic Evaluation for a Feasibility Study in Molybdenum Mineral Processing
In the development of mines, risk is latent in a variety of areas. Thus a feasibility study was conducted to determine certain risks. In particular, mineral processing for the recovery of a target mineral constitutes a very large percentage of the cost from the start of a project, and it is an important step in relation to the recovery of funds. In this study, a feasibility study of molybdenum mineral processing is done and comparisons are made between a pilot plant and a commercial plant using the LCCA evaluation method. At the pilot plant, the NPV value of a deterministic approach at five years is $68,984 and the probability that the NPV exceeds 0 is 58.23% according to Monte Carlo simulation done using a probabilistic approach. At the commercial plant, the NPV value with the deterministic approach at five years is –$10,820,473, and it was found that the probability of NPV according to deterministic estimation is 49.91% in a Monte Carlo simulation. As a result, the commercial plant is evaluated as experiencing a loss due to a decrease in the molybdenum concentrate price, whereas a price increase of 20% relative to the current molybdenum concentrate price can meet the margin after five years when the NPV exceeds over 0.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Optimum Design Using Genetic Algorithm and Discrete-element Method: Application to Vibration Feeder Design for E-waste Recycling Automation 画像認識技術による廃電子基板上製錬忌避素子/有価素子の自動検出 Effect of Impurities on Spinel Precipitation Behavior in Molten Fayalite Slag Study on Arsenic Methyltransferase of Cellulomonas sp. K31 Expressed in Recombinant E. coli Development of the Process for Concentrating Valuable Metals and Removing Smelting Repellent Components from Waste PCBs by Combining Roasting, Selective Comminution, and Physical Separation
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1