{"title":"阿索大桥改扩建活动断层调查及边坡稳定性评价","authors":"Koji Yamashita, Shingo Tanaka, Takefumi Yamaguchi","doi":"10.1680/jfoen.21.00003","DOIUrl":null,"url":null,"abstract":"The Aso Bridge is located near the Futagawa Fault, which is considered to be the epicenter fault of the Kumamoto Earthquake. This paper presents the technical findings obtained through the investigation and design of the Aso Ohashi Bridge replacement project after the Kumamoto Earthquake, including ① extraction of active fault zones ② evaluation of fault activity found on the cut slope, and ③ stability evaluation of the excavated surface behind the bridge piers considering the mechanical properties of columnar joints.","PeriodicalId":42902,"journal":{"name":"Proceedings of the Institution of Civil Engineers-Forensic Engineering","volume":null,"pages":null},"PeriodicalIF":0.4000,"publicationDate":"2022-10-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Active Fault investigation and slope stability evaluation for the Aso Bridge replacement\",\"authors\":\"Koji Yamashita, Shingo Tanaka, Takefumi Yamaguchi\",\"doi\":\"10.1680/jfoen.21.00003\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The Aso Bridge is located near the Futagawa Fault, which is considered to be the epicenter fault of the Kumamoto Earthquake. This paper presents the technical findings obtained through the investigation and design of the Aso Ohashi Bridge replacement project after the Kumamoto Earthquake, including ① extraction of active fault zones ② evaluation of fault activity found on the cut slope, and ③ stability evaluation of the excavated surface behind the bridge piers considering the mechanical properties of columnar joints.\",\"PeriodicalId\":42902,\"journal\":{\"name\":\"Proceedings of the Institution of Civil Engineers-Forensic Engineering\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.4000,\"publicationDate\":\"2022-10-10\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the Institution of Civil Engineers-Forensic Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1680/jfoen.21.00003\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"ENGINEERING, CIVIL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the Institution of Civil Engineers-Forensic Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1680/jfoen.21.00003","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, CIVIL","Score":null,"Total":0}
引用次数: 0

摘要

麻生桥位于被认为是熊本地震震中的双川断裂带附近。本文介绍了熊本地震后Aso Ohashi大桥更换工程的调查设计成果,包括①活动断裂带的提取;②切坡断层活动性评价;③考虑柱状节理力学特性的桥墩后开挖面稳定性评价。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Active Fault investigation and slope stability evaluation for the Aso Bridge replacement
The Aso Bridge is located near the Futagawa Fault, which is considered to be the epicenter fault of the Kumamoto Earthquake. This paper presents the technical findings obtained through the investigation and design of the Aso Ohashi Bridge replacement project after the Kumamoto Earthquake, including ① extraction of active fault zones ② evaluation of fault activity found on the cut slope, and ③ stability evaluation of the excavated surface behind the bridge piers considering the mechanical properties of columnar joints.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
1.70
自引率
0.00%
发文量
28
期刊最新文献
Using wearable technologies to minimise occupational illnesses among construction workers Driven pile foundation reuse in East London Managing piling obstruction risk intelligently for reinvention of a brutalist building Confidence and performance in different engineering tasks Strip footings for the extension of a piled building
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1