基于COPRAS Shadow的企业资源规划风险评估

{"title":"基于COPRAS Shadow的企业资源规划风险评估","authors":"","doi":"10.46632/rmc/1/1/21","DOIUrl":null,"url":null,"abstract":"Concepts of process orientation basically technical and organizational compromise to align imperatives and without a solid mechanism for doing so leverage the benefits of ERP to their full potential can’t feel. The system recommends that measuring take place from a balanced viewpoint with the goal of delivering relevant information that may facilitate decision-making, which can assist accomplish the corporate objectives and, as a result, drive the organization competitively forward. In this work, risk in ERP project by COPRAS MCDM approach is presented for estimation as a result of this study, here are some key points to mitigate to avoid failure proves that risks complex architecture and a greater number of modules, complex structure and less top management support of an ERP project.","PeriodicalId":23502,"journal":{"name":"Volume 1: Offshore Technology","volume":"54 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2020-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Risk Assessment in Enterprise Resource Planning by COPRAS Shadow\",\"authors\":\"\",\"doi\":\"10.46632/rmc/1/1/21\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Concepts of process orientation basically technical and organizational compromise to align imperatives and without a solid mechanism for doing so leverage the benefits of ERP to their full potential can’t feel. The system recommends that measuring take place from a balanced viewpoint with the goal of delivering relevant information that may facilitate decision-making, which can assist accomplish the corporate objectives and, as a result, drive the organization competitively forward. In this work, risk in ERP project by COPRAS MCDM approach is presented for estimation as a result of this study, here are some key points to mitigate to avoid failure proves that risks complex architecture and a greater number of modules, complex structure and less top management support of an ERP project.\",\"PeriodicalId\":23502,\"journal\":{\"name\":\"Volume 1: Offshore Technology\",\"volume\":\"54 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Volume 1: Offshore Technology\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.46632/rmc/1/1/21\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Volume 1: Offshore Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.46632/rmc/1/1/21","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

面向过程的概念基本上是技术上的和组织上的妥协,以协调要求,如果没有一个可靠的机制来做到这一点,ERP的好处就无法充分发挥其潜力。该系统建议从平衡的角度进行测量,其目标是提供可能促进决策的相关信息,这有助于实现公司目标,并最终推动组织竞争向前发展。本文采用COPRAS MCDM方法对ERP项目中的风险进行了估算,得出了ERP项目中存在的风险规避关键点,证明了ERP项目的结构复杂且模块数量较多,结构复杂且高层管理支持较少。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Risk Assessment in Enterprise Resource Planning by COPRAS Shadow
Concepts of process orientation basically technical and organizational compromise to align imperatives and without a solid mechanism for doing so leverage the benefits of ERP to their full potential can’t feel. The system recommends that measuring take place from a balanced viewpoint with the goal of delivering relevant information that may facilitate decision-making, which can assist accomplish the corporate objectives and, as a result, drive the organization competitively forward. In this work, risk in ERP project by COPRAS MCDM approach is presented for estimation as a result of this study, here are some key points to mitigate to avoid failure proves that risks complex architecture and a greater number of modules, complex structure and less top management support of an ERP project.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Importance of the Inertial Components in Modal State Covariances Prelude FLNG Free Weathervaning Heading Prediction and Uncertainties, Based on Machine Learning Model Applying Open Web Architectures Towards Collaborative Maritime Design and Simulation Joint-Industry Effort to Develop and Verify CFD Modeling Practice for Predicting Wave Impact Dynamic Response of a Generic Self-Elevating Unit in Operation With Hull in Water
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1