{"title":"在新西兰签订设计开发岗位合同:客户或承包商的成本?","authors":"D. Finnie, Naseem Ameer Ali, K. Park","doi":"10.1680/JMAPL.18.00044","DOIUrl":null,"url":null,"abstract":"By offering fixed-price contracts for designs supplied by clients, contractors legally warrant that they can build what has been designed and do so within their fixed price. Yet detailed drawings a...","PeriodicalId":44163,"journal":{"name":"Proceedings of the Institution of Civil Engineers-Management Procurement and Law","volume":"3 1","pages":""},"PeriodicalIF":1.3000,"publicationDate":"2019-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":"{\"title\":\"Design development post contract signing in New Zealand: client’s or contractor’s cost?\",\"authors\":\"D. Finnie, Naseem Ameer Ali, K. Park\",\"doi\":\"10.1680/JMAPL.18.00044\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"By offering fixed-price contracts for designs supplied by clients, contractors legally warrant that they can build what has been designed and do so within their fixed price. Yet detailed drawings a...\",\"PeriodicalId\":44163,\"journal\":{\"name\":\"Proceedings of the Institution of Civil Engineers-Management Procurement and Law\",\"volume\":\"3 1\",\"pages\":\"\"},\"PeriodicalIF\":1.3000,\"publicationDate\":\"2019-08-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"5\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the Institution of Civil Engineers-Management Procurement and Law\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1680/JMAPL.18.00044\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"MANAGEMENT\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the Institution of Civil Engineers-Management Procurement and Law","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1680/JMAPL.18.00044","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"MANAGEMENT","Score":null,"Total":0}
Design development post contract signing in New Zealand: client’s or contractor’s cost?
By offering fixed-price contracts for designs supplied by clients, contractors legally warrant that they can build what has been designed and do so within their fixed price. Yet detailed drawings a...