使用DPMN的业务流程建模和仿真:资源约束活动

Gerd Wagner
{"title":"使用DPMN的业务流程建模和仿真:资源约束活动","authors":"Gerd Wagner","doi":"10.1109/WSC48552.2020.9383915","DOIUrl":null,"url":null,"abstract":"This tutorial article, which is extracted from (Wagner 2019), shows how to use UML Class Diagrams and Discrete Event Process Modeling Notation (DPMN) Process Diagrams for making simulation models of business processes with resource-constrained activities based on the DES paradigm of Object Event Modeling and Simulation. In this approach, the state structure of a business system is captured by a UML Class Diagram, which defines the types of objects, events and activities underlying a DPMN Process Diagram, which captures the causal regularities of the system in the form of a set of event rules. DPMN Process Diagrams extend the Event Graphs proposed by Schruben (1983) by adding elements from the Business Process Modeling Notation (BPMN), viz. data objects and activities, and, as its main innovation over BPMN, resource-dependent activity start arrows.","PeriodicalId":6692,"journal":{"name":"2020 Winter Simulation Conference (WSC)","volume":"76 1","pages":"45-59"},"PeriodicalIF":0.0000,"publicationDate":"2020-12-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"Business Process Modeling And Simulation With DPMN: Resource-Constrained Activities\",\"authors\":\"Gerd Wagner\",\"doi\":\"10.1109/WSC48552.2020.9383915\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This tutorial article, which is extracted from (Wagner 2019), shows how to use UML Class Diagrams and Discrete Event Process Modeling Notation (DPMN) Process Diagrams for making simulation models of business processes with resource-constrained activities based on the DES paradigm of Object Event Modeling and Simulation. In this approach, the state structure of a business system is captured by a UML Class Diagram, which defines the types of objects, events and activities underlying a DPMN Process Diagram, which captures the causal regularities of the system in the form of a set of event rules. DPMN Process Diagrams extend the Event Graphs proposed by Schruben (1983) by adding elements from the Business Process Modeling Notation (BPMN), viz. data objects and activities, and, as its main innovation over BPMN, resource-dependent activity start arrows.\",\"PeriodicalId\":6692,\"journal\":{\"name\":\"2020 Winter Simulation Conference (WSC)\",\"volume\":\"76 1\",\"pages\":\"45-59\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-12-14\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2020 Winter Simulation Conference (WSC)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/WSC48552.2020.9383915\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2020 Winter Simulation Conference (WSC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/WSC48552.2020.9383915","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

摘要

这篇教程文章摘自(Wagner 2019),展示了如何使用UML类图和离散事件过程建模符号(DPMN)流程图,基于对象事件建模和仿真的DES范式,对具有资源约束活动的业务流程进行仿真模型。在这种方法中,业务系统的状态结构由UML类图捕获,该类图定义了DPMN流程图底层的对象、事件和活动的类型,DPMN流程图以一组事件规则的形式捕获系统的因果规律。DPMN流程图扩展了Schruben(1983)提出的事件图,添加了来自业务流程建模符号(BPMN)的元素,即数据对象和活动,并且,作为其对BPMN的主要创新,依赖资源的活动开始箭头。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Business Process Modeling And Simulation With DPMN: Resource-Constrained Activities
This tutorial article, which is extracted from (Wagner 2019), shows how to use UML Class Diagrams and Discrete Event Process Modeling Notation (DPMN) Process Diagrams for making simulation models of business processes with resource-constrained activities based on the DES paradigm of Object Event Modeling and Simulation. In this approach, the state structure of a business system is captured by a UML Class Diagram, which defines the types of objects, events and activities underlying a DPMN Process Diagram, which captures the causal regularities of the system in the form of a set of event rules. DPMN Process Diagrams extend the Event Graphs proposed by Schruben (1983) by adding elements from the Business Process Modeling Notation (BPMN), viz. data objects and activities, and, as its main innovation over BPMN, resource-dependent activity start arrows.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Précis: The Emotional Mind: The Affective Roots of Culture and Cognition Emotional Correctness Robot Collaboration Intelligence with AI Evaluation and Selection of Hospital Layout Based on an Integrated Simulation Method A Simheuristic Approach for Robust Scheduling of Airport Turnaround Teams
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1