环境影响评价:孟加拉桥梁建设企业的启示

MS Islam, S. Sultana, R. Sarker, M. Kabir, M. Ahammed
{"title":"环境影响评价:孟加拉桥梁建设企业的启示","authors":"MS Islam, S. Sultana, R. Sarker, M. Kabir, M. Ahammed","doi":"10.3329/jesnr.v13i1-2.60682","DOIUrl":null,"url":null,"abstract":"This study was conducted to assess the environmental impacts of the proposed Kashil Bridge over the river Jhinai at Basail upazila of Tangail district in Bangladesh during January to September 2019. The environmental impact assessment (EIA) is a mandatory process to assess the environmental consequences of an existing or proposed project and to delineate any environmental management measures that must be integrated into the plan to ensure that the project is technically, economically, socially and environmentally acceptable. The EIA preparation led to the identification of potential environmental and social impacts due to proposed bridge pre-construction, construction and operation activities on the Jhinai River and feasible remedial measures as included in the Environmental Management Plan (EMP). A field mobilization was conducted in project area to find out the environmental baseline (surface water, groundwater, soil, sediments, air, noise and ecology) information and identification of possible impacts. The focused group discussions (FGDs), questionnaire survey (QS) and key informants interview (KII) were conducted to collect relevant information. Secondary data were collected from Local Government Engineering Department, Upazila Agriculture Office, Upazila Fisheries Office, Department of Environment (DoE) and published relevant articles. Analyzing overall impacts, EIA study found that these possible negative impacts are considerable if some mitigation measures are applied. This new bridge will not only increase the communication facilities but also increase the economic flow together with other facilities. Finally, the EIA study suggested some defined EMP which will help to minimize the probable adverse impacts of the bridge construction site over the Jhinai River. \nEnviron. Sci. & Natural Resources, 13(1&2): 13-18, 2020","PeriodicalId":15768,"journal":{"name":"Journal of Environmental Science and Natural Resources","volume":"64 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-07-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Environmental Impact Assessment: Implications of Bridge Construction Venture in Bangladesh\",\"authors\":\"MS Islam, S. Sultana, R. Sarker, M. Kabir, M. Ahammed\",\"doi\":\"10.3329/jesnr.v13i1-2.60682\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This study was conducted to assess the environmental impacts of the proposed Kashil Bridge over the river Jhinai at Basail upazila of Tangail district in Bangladesh during January to September 2019. The environmental impact assessment (EIA) is a mandatory process to assess the environmental consequences of an existing or proposed project and to delineate any environmental management measures that must be integrated into the plan to ensure that the project is technically, economically, socially and environmentally acceptable. The EIA preparation led to the identification of potential environmental and social impacts due to proposed bridge pre-construction, construction and operation activities on the Jhinai River and feasible remedial measures as included in the Environmental Management Plan (EMP). A field mobilization was conducted in project area to find out the environmental baseline (surface water, groundwater, soil, sediments, air, noise and ecology) information and identification of possible impacts. The focused group discussions (FGDs), questionnaire survey (QS) and key informants interview (KII) were conducted to collect relevant information. Secondary data were collected from Local Government Engineering Department, Upazila Agriculture Office, Upazila Fisheries Office, Department of Environment (DoE) and published relevant articles. Analyzing overall impacts, EIA study found that these possible negative impacts are considerable if some mitigation measures are applied. This new bridge will not only increase the communication facilities but also increase the economic flow together with other facilities. Finally, the EIA study suggested some defined EMP which will help to minimize the probable adverse impacts of the bridge construction site over the Jhinai River. \\nEnviron. Sci. & Natural Resources, 13(1&2): 13-18, 2020\",\"PeriodicalId\":15768,\"journal\":{\"name\":\"Journal of Environmental Science and Natural Resources\",\"volume\":\"64 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-07-06\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Environmental Science and Natural Resources\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.3329/jesnr.v13i1-2.60682\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Environmental Science and Natural Resources","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.3329/jesnr.v13i1-2.60682","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

本研究旨在评估2019年1月至9月期间孟加拉国坦盖尔区Basail upazila吉纳伊河上拟议的卡希尔大桥对环境的影响。环境影响评估是一项强制性程序,目的是评估现有或拟议项目的环境后果,并界定必须纳入计划的任何环境管理措施,以确保项目在技术、经济、社会和环境方面均可接受。环境影响评估的准备工作确定了吉奈河上拟建桥梁的前期建设、施工和运营活动对环境和社会的潜在影响,并提出了环境管理计划(EMP)中的可行补救措施。在项目区进行了实地动员,以了解环境基线(地表水、地下水、土壤、沉积物、空气、噪声和生态)信息并确定可能的影响。通过焦点小组讨论(fgd)、问卷调查(QS)和关键举报人访谈(KII)收集相关信息。二手数据收集自当地政府工程部、Upazila农业办公室、Upazila渔业办公室、环境部(DoE),并发表相关文章。环评研究分析整体影响后发现,如果采取一些缓解措施,这些可能产生的负面影响是相当大的。这座新桥不仅增加了交通设施,而且与其他设施一起增加了经济流量。最后,环评研究建议了一些明确的电磁脉冲,这将有助于最大限度地减少吉乃河大桥施工现场可能产生的不利影响。环绕。科学。与自然资源,13(1&2):13-18,2020
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Environmental Impact Assessment: Implications of Bridge Construction Venture in Bangladesh
This study was conducted to assess the environmental impacts of the proposed Kashil Bridge over the river Jhinai at Basail upazila of Tangail district in Bangladesh during January to September 2019. The environmental impact assessment (EIA) is a mandatory process to assess the environmental consequences of an existing or proposed project and to delineate any environmental management measures that must be integrated into the plan to ensure that the project is technically, economically, socially and environmentally acceptable. The EIA preparation led to the identification of potential environmental and social impacts due to proposed bridge pre-construction, construction and operation activities on the Jhinai River and feasible remedial measures as included in the Environmental Management Plan (EMP). A field mobilization was conducted in project area to find out the environmental baseline (surface water, groundwater, soil, sediments, air, noise and ecology) information and identification of possible impacts. The focused group discussions (FGDs), questionnaire survey (QS) and key informants interview (KII) were conducted to collect relevant information. Secondary data were collected from Local Government Engineering Department, Upazila Agriculture Office, Upazila Fisheries Office, Department of Environment (DoE) and published relevant articles. Analyzing overall impacts, EIA study found that these possible negative impacts are considerable if some mitigation measures are applied. This new bridge will not only increase the communication facilities but also increase the economic flow together with other facilities. Finally, the EIA study suggested some defined EMP which will help to minimize the probable adverse impacts of the bridge construction site over the Jhinai River. Environ. Sci. & Natural Resources, 13(1&2): 13-18, 2020
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Assessment of Noise Exposure Indices at Kanchijhuli and Townhall Moor in Mymensingh City Assessment of Air Quality Parameters at Different Locations of Tangail Sadar Upazila, Tangail Screening of Some Botanicals for Eco-friendly Control of Cucurbit Fruit Fly (Bactrocera cucurbitae) Infestation in Experimental Cucumber Field Sanitation Pattern and its Impact on Child in Relation to their Diarrheal Disease of two Upazilla under Satkhira District Monitoring Long-Term Wheat Cultivation and Climatic Drivers for Land Use Change: A Case Study Using Remote Sensing at Thakurgaon Sadar in Bangladesh
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1