采用自顶向下技术在市区进行长不规则开挖

IF 2 4区 工程技术 Q3 ENGINEERING, GEOLOGICAL Proceedings of the Institution of Civil Engineers-Geotechnical Engineering Pub Date : 2022-04-05 DOI:10.1680/jgeen.21.00156
Yang Sun, Zhenxue Gu, Zhenyang Xu, Chongxiao Wang, Dewei Song
{"title":"采用自顶向下技术在市区进行长不规则开挖","authors":"Yang Sun, Zhenxue Gu, Zhenyang Xu, Chongxiao Wang, Dewei Song","doi":"10.1680/jgeen.21.00156","DOIUrl":null,"url":null,"abstract":"A 1257 m-long special-shaped deep excavation was performed in the city center of Nanjing, China. Full-width and half-width top-down construction methods were adopted. Based on the long-term monitoring data of the project, this paper analyzed the evolution characteristics of the diaphragm wall deformation, the ground settlement and the settlement of adjacent buildings and discussed their interrelationships and their relationships with the excavation process, structural system and geological conditions. The results showed that the horizontal displacement of the diaphragm walls was less than 1% of the excavation depth and that the position of the maximum horizontal displacement was generally located from 4 m above the excavation surface to the vicinity of the excavation surface. The influence range of excavation on the surrounding ground settlement was mostly within three times the excavation depth, and the ground settlement varied from 0.1%∼0.5% of the excavation depth to 0.3∼5 times the maximum horizontal displacement of the diaphragm wall. During the construction process, the settlement rate suddenly increased only when the excavation reached the soft soil layer. Building settlement was related to the excavation deformation, structure forms, foundation types and distance to the foundation pit.","PeriodicalId":54572,"journal":{"name":"Proceedings of the Institution of Civil Engineers-Geotechnical Engineering","volume":null,"pages":null},"PeriodicalIF":2.0000,"publicationDate":"2022-04-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Performance of a long irregular excavation by the top-down technique in a downtown area\",\"authors\":\"Yang Sun, Zhenxue Gu, Zhenyang Xu, Chongxiao Wang, Dewei Song\",\"doi\":\"10.1680/jgeen.21.00156\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"A 1257 m-long special-shaped deep excavation was performed in the city center of Nanjing, China. Full-width and half-width top-down construction methods were adopted. Based on the long-term monitoring data of the project, this paper analyzed the evolution characteristics of the diaphragm wall deformation, the ground settlement and the settlement of adjacent buildings and discussed their interrelationships and their relationships with the excavation process, structural system and geological conditions. The results showed that the horizontal displacement of the diaphragm walls was less than 1% of the excavation depth and that the position of the maximum horizontal displacement was generally located from 4 m above the excavation surface to the vicinity of the excavation surface. The influence range of excavation on the surrounding ground settlement was mostly within three times the excavation depth, and the ground settlement varied from 0.1%∼0.5% of the excavation depth to 0.3∼5 times the maximum horizontal displacement of the diaphragm wall. During the construction process, the settlement rate suddenly increased only when the excavation reached the soft soil layer. Building settlement was related to the excavation deformation, structure forms, foundation types and distance to the foundation pit.\",\"PeriodicalId\":54572,\"journal\":{\"name\":\"Proceedings of the Institution of Civil Engineers-Geotechnical Engineering\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":2.0000,\"publicationDate\":\"2022-04-05\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the Institution of Civil Engineers-Geotechnical Engineering\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.1680/jgeen.21.00156\",\"RegionNum\":4,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"ENGINEERING, GEOLOGICAL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the Institution of Civil Engineers-Geotechnical Engineering","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.1680/jgeen.21.00156","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, GEOLOGICAL","Score":null,"Total":0}
引用次数: 1

摘要

中国南京市中心进行了一次1257米长的异形深挖。采用全宽、半宽自上而下施工方法。根据工程长期监测资料,分析了地下连续墙变形、地面沉降和邻近建筑物沉降的演变特征,探讨了它们之间的相互关系以及与开挖过程、结构体系和地质条件的关系。结果表明:连续墙水平位移小于开挖深度的1%,最大水平位移位置一般位于开挖面以上4 m至开挖面附近。基坑开挖对周边地表沉降的影响范围多在3倍开挖深度内,地表沉降变化范围为开挖深度的0.1% ~ 0.5%至连续墙最大水平位移的0.3 ~ 5倍。在施工过程中,只有开挖到软土层时沉降速率才突然增大。建筑物沉降与开挖变形、结构形式、地基类型及与基坑的距离有关。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Performance of a long irregular excavation by the top-down technique in a downtown area
A 1257 m-long special-shaped deep excavation was performed in the city center of Nanjing, China. Full-width and half-width top-down construction methods were adopted. Based on the long-term monitoring data of the project, this paper analyzed the evolution characteristics of the diaphragm wall deformation, the ground settlement and the settlement of adjacent buildings and discussed their interrelationships and their relationships with the excavation process, structural system and geological conditions. The results showed that the horizontal displacement of the diaphragm walls was less than 1% of the excavation depth and that the position of the maximum horizontal displacement was generally located from 4 m above the excavation surface to the vicinity of the excavation surface. The influence range of excavation on the surrounding ground settlement was mostly within three times the excavation depth, and the ground settlement varied from 0.1%∼0.5% of the excavation depth to 0.3∼5 times the maximum horizontal displacement of the diaphragm wall. During the construction process, the settlement rate suddenly increased only when the excavation reached the soft soil layer. Building settlement was related to the excavation deformation, structure forms, foundation types and distance to the foundation pit.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
4.40
自引率
4.50%
发文量
68
审稿时长
3 months
期刊介绍: Geotechnical Engineering provides a forum for the publication of high quality, topical and relevant technical papers covering all aspects of geotechnical research, design, construction and performance. The journal aims to be of interest to those civil, structural or geotechnical engineering practitioners wishing to develop a greater understanding of the influence of geotechnics on the built environment.
期刊最新文献
A case history of monitoring a wide pile group Part I: geology, single pile analysis and testing, and monitoring data Torsional vibration of a tapered pile considering circumferential support of surrounding soil Applicability of construction dewatering techniques for randomly fractured rock Sensitivity investigation of drilling efficiency to operational parameters of a drifter Hyperbolic load-displacement analysis of helical and expanded piles: database approach
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1