广州北部某地区配电线路雷击跳闸保护研究

Qiu Hong, Yuting Chen, Yue He, Zhitao Huang, Xiaotong Huang, Haiying Lu, Yifeng He
{"title":"广州北部某地区配电线路雷击跳闸保护研究","authors":"Qiu Hong, Yuting Chen, Yue He, Zhitao Huang, Xiaotong Huang, Haiying Lu, Yifeng He","doi":"10.1109/ATEEE54283.2021.00018","DOIUrl":null,"url":null,"abstract":"In view of the current situation of frequent tripping of 10kV distribution lines in northern mountainous areas of Guangzhou, through the analysis of the causes of line tripping in the past three years, it is found that lightning strike is one of the main factors leading to line tripping. Through the analysis of the natural lightning strikes in the region, the effect of the existing lightning protection facilities is evaluated. Given the lightning protection measures of 10kV distribution lines in the region, the composite lightning protection measures such as adding overhead lightning conductor, adding multi-chamber lightning arrester, and repairing grounding grid resistance are proposed to improve. The working principle and improvement effect of each measure are expounded. After implementing various measures, the lightning conditions and tripping data of a quarter are analyzed and compared. The results show that the comprehensive lightning protection measures effectively reduce the tripping caused by lightning. The actual operation effect verifies the feasibility and effectiveness of the measures proposed in this paper.","PeriodicalId":62545,"journal":{"name":"电工电能新技术","volume":"13 1","pages":"46-50"},"PeriodicalIF":0.0000,"publicationDate":"2021-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Study on Lightning Trip Protection for Distribution Lines in a Certain Area of Northern Guangzhou\",\"authors\":\"Qiu Hong, Yuting Chen, Yue He, Zhitao Huang, Xiaotong Huang, Haiying Lu, Yifeng He\",\"doi\":\"10.1109/ATEEE54283.2021.00018\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In view of the current situation of frequent tripping of 10kV distribution lines in northern mountainous areas of Guangzhou, through the analysis of the causes of line tripping in the past three years, it is found that lightning strike is one of the main factors leading to line tripping. Through the analysis of the natural lightning strikes in the region, the effect of the existing lightning protection facilities is evaluated. Given the lightning protection measures of 10kV distribution lines in the region, the composite lightning protection measures such as adding overhead lightning conductor, adding multi-chamber lightning arrester, and repairing grounding grid resistance are proposed to improve. The working principle and improvement effect of each measure are expounded. After implementing various measures, the lightning conditions and tripping data of a quarter are analyzed and compared. The results show that the comprehensive lightning protection measures effectively reduce the tripping caused by lightning. The actual operation effect verifies the feasibility and effectiveness of the measures proposed in this paper.\",\"PeriodicalId\":62545,\"journal\":{\"name\":\"电工电能新技术\",\"volume\":\"13 1\",\"pages\":\"46-50\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"电工电能新技术\",\"FirstCategoryId\":\"1087\",\"ListUrlMain\":\"https://doi.org/10.1109/ATEEE54283.2021.00018\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"电工电能新技术","FirstCategoryId":"1087","ListUrlMain":"https://doi.org/10.1109/ATEEE54283.2021.00018","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

针对广州北部山区10kV配电线路频繁跳闸的现状,通过对近三年线路跳闸原因的分析,发现雷击是导致线路跳闸的主要因素之一。通过对该地区自然雷击的分析,对现有防雷设施的效果进行了评价。针对该地区10kV配电线路的防雷措施,提出了增加架空避雷针、增加多室避雷器、修复接地网电阻等复合防雷措施加以改进。阐述了各项措施的工作原理和改进效果。在采取各种措施后,对某季度的雷电情况和跳闸数据进行了分析比较。结果表明,综合防雷措施有效地减少了雷电引起的跳闸。实际运行效果验证了本文所提出措施的可行性和有效性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Study on Lightning Trip Protection for Distribution Lines in a Certain Area of Northern Guangzhou
In view of the current situation of frequent tripping of 10kV distribution lines in northern mountainous areas of Guangzhou, through the analysis of the causes of line tripping in the past three years, it is found that lightning strike is one of the main factors leading to line tripping. Through the analysis of the natural lightning strikes in the region, the effect of the existing lightning protection facilities is evaluated. Given the lightning protection measures of 10kV distribution lines in the region, the composite lightning protection measures such as adding overhead lightning conductor, adding multi-chamber lightning arrester, and repairing grounding grid resistance are proposed to improve. The working principle and improvement effect of each measure are expounded. After implementing various measures, the lightning conditions and tripping data of a quarter are analyzed and compared. The results show that the comprehensive lightning protection measures effectively reduce the tripping caused by lightning. The actual operation effect verifies the feasibility and effectiveness of the measures proposed in this paper.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
3166
期刊介绍:
期刊最新文献
Medical product sales forecasting at pharmaceutical distribution company (Case study: PT. Lenko Surya Perkasa Branch Office Sidoarjo) Generator capacity predictor system modeling using decision tree regressor at PT Saka Indonesia Pangkah Limited Performance analysis method through process variable modeling to maintain top product quality on fuel gas scrubber performance: A case study of fuel gas scrubber 141-V-01 Synthesis and characterization of folic acid-functionalized, doxorubicin-loaded magnetic nanoparticles as drug delivery system for cancer Hydrolysis optimization for producing acetone-butanol-ethanol from waste palm Empty Bunches after pretreatment process with alkali peroxide
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1