在多产品供应商-客户合并系统中,返工、延期、多次发货和加班生产公共组件的综合效应

IF 1.6 3区 工程技术 Q4 ENGINEERING, INDUSTRIAL International Journal of Industrial Engineering Computations Pub Date : 2022-01-01 DOI:10.5267/j.ijiec.2022.2.003
Y. Chiu, Liang You, Tiffany Chiu, Fan-Yun Pai
{"title":"在多产品供应商-客户合并系统中,返工、延期、多次发货和加班生产公共组件的综合效应","authors":"Y. Chiu, Liang You, Tiffany Chiu, Fan-Yun Pai","doi":"10.5267/j.ijiec.2022.2.003","DOIUrl":null,"url":null,"abstract":"The study examines the combined effect of rework, multiple shipments, postponement, and overtime producing common-component on a multiproduct vendor-client incorporated system. Clients’ product demand trend turns to diversity, quality, and rapid response in the current supply-chain environment. Under such a stiff competitive environment, today’s manufacturers must effectively plan their multi-item fabrication to boost utilization and product quality, minimize total relevant costs, and meet short given order lead time. By considering the commonality of the finished goods, required quality, and completion lead time, this study presents an exact model featuring rework of defects, multiple shipments, postponement, overtime producing the mutual component, and satisfying the market needs. Through the techniques of explicitly modeling, formulating, and system cost minimization, this study simultaneously derives the optimal cycle-time and shipping frequency for the studied problem. A numerical example helps show how our model works for any given parameter values and how the variation in single and multiple factors of the problem affects the crucial system performances (e.g., total uptimes, each relevant cost, utilization, total cost, etc.) A wide variety of today’s industries (e.g., automotive, household goods, etc.) and their related supply chains can utilize our decisional model to reveal in-depth managerial insights for planning their fabrication and shipments.","PeriodicalId":51356,"journal":{"name":"International Journal of Industrial Engineering Computations","volume":"56 1","pages":""},"PeriodicalIF":1.6000,"publicationDate":"2022-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"The combined effect of rework, postponement, multiple shipments, and overtime producing common-component on a multiproduct vendor-client incorporated system\",\"authors\":\"Y. Chiu, Liang You, Tiffany Chiu, Fan-Yun Pai\",\"doi\":\"10.5267/j.ijiec.2022.2.003\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The study examines the combined effect of rework, multiple shipments, postponement, and overtime producing common-component on a multiproduct vendor-client incorporated system. Clients’ product demand trend turns to diversity, quality, and rapid response in the current supply-chain environment. Under such a stiff competitive environment, today’s manufacturers must effectively plan their multi-item fabrication to boost utilization and product quality, minimize total relevant costs, and meet short given order lead time. By considering the commonality of the finished goods, required quality, and completion lead time, this study presents an exact model featuring rework of defects, multiple shipments, postponement, overtime producing the mutual component, and satisfying the market needs. Through the techniques of explicitly modeling, formulating, and system cost minimization, this study simultaneously derives the optimal cycle-time and shipping frequency for the studied problem. A numerical example helps show how our model works for any given parameter values and how the variation in single and multiple factors of the problem affects the crucial system performances (e.g., total uptimes, each relevant cost, utilization, total cost, etc.) A wide variety of today’s industries (e.g., automotive, household goods, etc.) and their related supply chains can utilize our decisional model to reveal in-depth managerial insights for planning their fabrication and shipments.\",\"PeriodicalId\":51356,\"journal\":{\"name\":\"International Journal of Industrial Engineering Computations\",\"volume\":\"56 1\",\"pages\":\"\"},\"PeriodicalIF\":1.6000,\"publicationDate\":\"2022-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Industrial Engineering Computations\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.5267/j.ijiec.2022.2.003\",\"RegionNum\":3,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"ENGINEERING, INDUSTRIAL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Industrial Engineering Computations","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.5267/j.ijiec.2022.2.003","RegionNum":3,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, INDUSTRIAL","Score":null,"Total":0}
引用次数: 1

摘要

本研究考察了在一个多产品供应商-客户合并系统中,返工、多次出货、延期和加班生产通用组件的综合影响。在当前的供应链环境下,客户的产品需求趋势是多样化、高质量、快速响应。在如此激烈的竞争环境下,当今的制造商必须有效地规划他们的多项目制造,以提高利用率和产品质量,最大限度地降低相关总成本,并满足较短的给定订单交货时间。考虑成品共性、质量要求、交货期等因素,提出了缺陷返工、多次出货、延期、加班生产互件、满足市场需求的精确模型。通过显式建模、公式化和系统成本最小化技术,同时得出了所研究问题的最优周期时间和运输频率。一个数值例子有助于展示我们的模型如何适用于任何给定的参数值,以及问题的单个和多个因素的变化如何影响关键的系统性能(例如,总正常运行时间、每个相关成本、利用率、总成本等)。当今各种各样的行业(例如,汽车、家居用品等)及其相关供应链可以利用我们的决策模型来揭示深入的管理见解,以规划其制造和运输。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
The combined effect of rework, postponement, multiple shipments, and overtime producing common-component on a multiproduct vendor-client incorporated system
The study examines the combined effect of rework, multiple shipments, postponement, and overtime producing common-component on a multiproduct vendor-client incorporated system. Clients’ product demand trend turns to diversity, quality, and rapid response in the current supply-chain environment. Under such a stiff competitive environment, today’s manufacturers must effectively plan their multi-item fabrication to boost utilization and product quality, minimize total relevant costs, and meet short given order lead time. By considering the commonality of the finished goods, required quality, and completion lead time, this study presents an exact model featuring rework of defects, multiple shipments, postponement, overtime producing the mutual component, and satisfying the market needs. Through the techniques of explicitly modeling, formulating, and system cost minimization, this study simultaneously derives the optimal cycle-time and shipping frequency for the studied problem. A numerical example helps show how our model works for any given parameter values and how the variation in single and multiple factors of the problem affects the crucial system performances (e.g., total uptimes, each relevant cost, utilization, total cost, etc.) A wide variety of today’s industries (e.g., automotive, household goods, etc.) and their related supply chains can utilize our decisional model to reveal in-depth managerial insights for planning their fabrication and shipments.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
5.70
自引率
9.10%
发文量
35
审稿时长
20 weeks
期刊最新文献
A unifying framework and a mathematical model for the Slab Stack Shuffling Problem Heuristics and metaheuristics to minimize makespan for flowshop with peak power consumption constraints Minimizing operating expenditures for a manufacturing system featuring quality reassurances, probabilistic failures, overtime, and outsourcing Composite heuristics and water wave optimality algorithms for tri-criteria multiple job classes and customer order scheduling on a single machine Investigating the collective impact of postponement, scrap, and external suppliers on multiproduct replenishing decision
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1