工程设计室工作的优化调度

L.M. Rose ∗, E.C. Irniger
{"title":"工程设计室工作的优化调度","authors":"L.M. Rose ∗,&nbsp;E.C. Irniger","doi":"10.1016/0377-841X(78)90065-7","DOIUrl":null,"url":null,"abstract":"<div><p>A method is described for determining the optimum amount of design effort to employ on each project of a set of projects in engineering design office.</p><p>For each project, the design time for different levels of design and the expected savings from the more detailed levels must be provided. Also, estimates of the market losses due to delayed start-up, and the probability of the project being completed must be supplied.</p><p>A combinatorial program then selects the optimum level of design for each project. An example is given.</p></div>","PeriodicalId":100475,"journal":{"name":"Engineering and Process Economics","volume":"3 3","pages":"Pages 187-193"},"PeriodicalIF":0.0000,"publicationDate":"1978-05-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/0377-841X(78)90065-7","citationCount":"0","resultStr":"{\"title\":\"Optimum scheduling of engineering design office work\",\"authors\":\"L.M. Rose ∗,&nbsp;E.C. Irniger\",\"doi\":\"10.1016/0377-841X(78)90065-7\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<div><p>A method is described for determining the optimum amount of design effort to employ on each project of a set of projects in engineering design office.</p><p>For each project, the design time for different levels of design and the expected savings from the more detailed levels must be provided. Also, estimates of the market losses due to delayed start-up, and the probability of the project being completed must be supplied.</p><p>A combinatorial program then selects the optimum level of design for each project. An example is given.</p></div>\",\"PeriodicalId\":100475,\"journal\":{\"name\":\"Engineering and Process Economics\",\"volume\":\"3 3\",\"pages\":\"Pages 187-193\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1978-05-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://sci-hub-pdf.com/10.1016/0377-841X(78)90065-7\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Engineering and Process Economics\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://www.sciencedirect.com/science/article/pii/0377841X78900657\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Engineering and Process Economics","FirstCategoryId":"1085","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/0377841X78900657","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本文描述了一种在工程设计室确定一组项目中每个项目的最佳设计工作量的方法。对于每个项目,必须提供不同设计级别的设计时间和更详细级别的预期节省。此外,还必须提供由于延迟启动而造成的市场损失的估计,以及项目完成的可能性。然后,组合程序为每个项目选择最佳设计水平。给出了一个例子。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Optimum scheduling of engineering design office work

A method is described for determining the optimum amount of design effort to employ on each project of a set of projects in engineering design office.

For each project, the design time for different levels of design and the expected savings from the more detailed levels must be provided. Also, estimates of the market losses due to delayed start-up, and the probability of the project being completed must be supplied.

A combinatorial program then selects the optimum level of design for each project. An example is given.

求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Author index Models for present-worth analysis of selected industrial cash flow patterns Measurement of technology progress and capital cost for nuclear, coal-fired, and gas-fired power plants using the learning curve Modelling capital expenditure Editorial note
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1