{"title":"有专用机器和无缓冲的两阶段比例柔性流水车间调度","authors":"Heiner Ackermann, Lena Schwehm, C. Weiß","doi":"10.1007/978-3-031-08623-6_52","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":79700,"journal":{"name":"OR manager","volume":"1 1","pages":"353-358"},"PeriodicalIF":0.0000,"publicationDate":"2021-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Scheduling a Two Stage Proportionate Flexible Flow Shop with Dedicated Machines and No Buffers\",\"authors\":\"Heiner Ackermann, Lena Schwehm, C. Weiß\",\"doi\":\"10.1007/978-3-031-08623-6_52\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\",\"PeriodicalId\":79700,\"journal\":{\"name\":\"OR manager\",\"volume\":\"1 1\",\"pages\":\"353-358\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"OR manager\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1007/978-3-031-08623-6_52\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"OR manager","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1007/978-3-031-08623-6_52","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}