巴厘岛Toyapakeh海峡潮汐流涡轮机农场的潜力研究

A. Kurniawan, Prayla Putri Annani Barli, M. B. Pratama, A. Fitriadhy
{"title":"巴厘岛Toyapakeh海峡潮汐流涡轮机农场的潜力研究","authors":"A. Kurniawan, Prayla Putri Annani Barli, M. B. Pratama, A. Fitriadhy","doi":"10.14710/ik.ijms.26.3.155-162","DOIUrl":null,"url":null,"abstract":"In 2015, Bali Province is mandated by ESDM ministry to become the National Region of Clean Energy, promoting efforts to explore new source of electricity namely tidal stream energy. Previous works have demonstrated that Toyapakeh Strait contains a promising tidal stream resource, with a high stream in a long period. In this study, hydrodynamic modelling and power production analysis is conducted to evaluate this potential with an aim to meet energy demand of Tiga Nusa Cluster Islands. Twenty-one Gen5 KHPS turbines are employed in this study, at an optimized location, 8.72°S, 115.44°E, which contains the highest energy potential. Financial analysis, with 25-year return period of investment and 3.60% interest rate, resulting levelized cost of energy (LCOE) of Rp 6,100.kWh-1. This value is higher than the national and regional selling nominal, in other word the energy cost of tidal stream turbine is relatively high in this location. Nearly 46% of energy cost is spent for turbine fabrication, and from the sensitivity analysis, cutting half the turbine costs may reduce the price by Rp 1,400.kWh-1 while increasing the amount of installed turbine is less significant. Despite of the high prices, the study shows that Toyapakeh Strait holds a promising resource of tidal stream energy.","PeriodicalId":13381,"journal":{"name":"ILMU KELAUTAN: Indonesian Journal of Marine Sciences","volume":"51 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2021-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Potential Study of Tidal Stream Turbine Farm at Toyapakeh Strait, Bali\",\"authors\":\"A. Kurniawan, Prayla Putri Annani Barli, M. B. Pratama, A. Fitriadhy\",\"doi\":\"10.14710/ik.ijms.26.3.155-162\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In 2015, Bali Province is mandated by ESDM ministry to become the National Region of Clean Energy, promoting efforts to explore new source of electricity namely tidal stream energy. Previous works have demonstrated that Toyapakeh Strait contains a promising tidal stream resource, with a high stream in a long period. In this study, hydrodynamic modelling and power production analysis is conducted to evaluate this potential with an aim to meet energy demand of Tiga Nusa Cluster Islands. Twenty-one Gen5 KHPS turbines are employed in this study, at an optimized location, 8.72°S, 115.44°E, which contains the highest energy potential. Financial analysis, with 25-year return period of investment and 3.60% interest rate, resulting levelized cost of energy (LCOE) of Rp 6,100.kWh-1. This value is higher than the national and regional selling nominal, in other word the energy cost of tidal stream turbine is relatively high in this location. Nearly 46% of energy cost is spent for turbine fabrication, and from the sensitivity analysis, cutting half the turbine costs may reduce the price by Rp 1,400.kWh-1 while increasing the amount of installed turbine is less significant. Despite of the high prices, the study shows that Toyapakeh Strait holds a promising resource of tidal stream energy.\",\"PeriodicalId\":13381,\"journal\":{\"name\":\"ILMU KELAUTAN: Indonesian Journal of Marine Sciences\",\"volume\":\"51 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"ILMU KELAUTAN: Indonesian Journal of Marine Sciences\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.14710/ik.ijms.26.3.155-162\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"ILMU KELAUTAN: Indonesian Journal of Marine Sciences","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.14710/ik.ijms.26.3.155-162","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

2015年,巴厘省被ESDM部授权成为国家清洁能源地区,促进探索新的电力来源,即潮汐能。前人的研究表明,Toyapakeh海峡潮汐流资源潜力巨大,长期处于高流量状态。在本研究中,进行了水动力建模和电力生产分析,以评估这种潜力,目的是满足提加努萨群岛的能源需求。本研究采用21台5代KHPS涡轮机,优化位置为8.72°S, 115.44°E,能量潜力最高。财务分析,投资回报率为25年,利率为3.60%,平均能源成本(LCOE)为Rp 6,100 kwh -1。该值高于国家和地区的销售标称,也就是说,该地区的潮汐能水轮机的能源成本相对较高。近46%的能源成本花在涡轮机制造上,从敏感性分析来看,削减一半的涡轮机成本可能会降低1400卢比的价格。kWh-1,而增加安装涡轮机的数量则不太重要。尽管价格高昂,但研究表明,Toyapakeh海峡拥有一个有前途的潮汐流能源资源。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Potential Study of Tidal Stream Turbine Farm at Toyapakeh Strait, Bali
In 2015, Bali Province is mandated by ESDM ministry to become the National Region of Clean Energy, promoting efforts to explore new source of electricity namely tidal stream energy. Previous works have demonstrated that Toyapakeh Strait contains a promising tidal stream resource, with a high stream in a long period. In this study, hydrodynamic modelling and power production analysis is conducted to evaluate this potential with an aim to meet energy demand of Tiga Nusa Cluster Islands. Twenty-one Gen5 KHPS turbines are employed in this study, at an optimized location, 8.72°S, 115.44°E, which contains the highest energy potential. Financial analysis, with 25-year return period of investment and 3.60% interest rate, resulting levelized cost of energy (LCOE) of Rp 6,100.kWh-1. This value is higher than the national and regional selling nominal, in other word the energy cost of tidal stream turbine is relatively high in this location. Nearly 46% of energy cost is spent for turbine fabrication, and from the sensitivity analysis, cutting half the turbine costs may reduce the price by Rp 1,400.kWh-1 while increasing the amount of installed turbine is less significant. Despite of the high prices, the study shows that Toyapakeh Strait holds a promising resource of tidal stream energy.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Biometric Relationship Between Growth Pattern and Biological Reproduction of a Living Fossil Benthic Brachiopods (Lingula anatina Lamarck, 1801) in Aceh Northern Shore Distribution and Contamination Level of Cuprum (Cu) and Plumbum (Pb) in Bulk Sediments of the Bangka Island Comparison of Reproductive Aspects of the Tropical Eel Anguilla bicolor (McClelland 1884) in Freshwater and Estuarine Habitats Heavy Metal Contamination on Vannamei Shrimp Aquaculture in North Coast of Central Java Utilizing Spectral Indices to Estimate Total Dissolved Solids in Water Body Northwest Arabian Gulf
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1