剖析项目结构:了解管理建设项目的成本

IF 6.1 3区 管理学 Q1 ENGINEERING, INDUSTRIAL Production Planning & Control Pub Date : 2021-04-20 DOI:10.1080/09537287.2021.1891480
Haavard Haaskjold, B. Andersen, Jan Alexander Langlo
{"title":"剖析项目结构:了解管理建设项目的成本","authors":"Haavard Haaskjold, B. Andersen, Jan Alexander Langlo","doi":"10.1080/09537287.2021.1891480","DOIUrl":null,"url":null,"abstract":"Abstract The total cost of a construction project involves both the cost of production and the transaction costs associated with managing the project. However, we know surprisingly little about the magnitude of transaction costs in construction projects. The purpose of this paper is to provide more empirical data as we study what proportion of the total cost in construction projects is spent on managing the project. We use the analogy of human anatomy as we investigate the size of a project’s head (managing the project) compared to the size of its body (producing deliverables). Using a dataset from 134 construction projects in Norway, we find that the project head consists of more than 18% of the total project cost on average. We also investigate how the size of the project head varies depending on a project’s complexity, size, duration and burn rate.","PeriodicalId":20627,"journal":{"name":"Production Planning & Control","volume":null,"pages":null},"PeriodicalIF":6.1000,"publicationDate":"2021-04-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"12","resultStr":"{\"title\":\"Dissecting the project anatomy: Understanding the cost of managing construction projects\",\"authors\":\"Haavard Haaskjold, B. Andersen, Jan Alexander Langlo\",\"doi\":\"10.1080/09537287.2021.1891480\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract The total cost of a construction project involves both the cost of production and the transaction costs associated with managing the project. However, we know surprisingly little about the magnitude of transaction costs in construction projects. The purpose of this paper is to provide more empirical data as we study what proportion of the total cost in construction projects is spent on managing the project. We use the analogy of human anatomy as we investigate the size of a project’s head (managing the project) compared to the size of its body (producing deliverables). Using a dataset from 134 construction projects in Norway, we find that the project head consists of more than 18% of the total project cost on average. We also investigate how the size of the project head varies depending on a project’s complexity, size, duration and burn rate.\",\"PeriodicalId\":20627,\"journal\":{\"name\":\"Production Planning & Control\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":6.1000,\"publicationDate\":\"2021-04-20\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"12\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Production Planning & Control\",\"FirstCategoryId\":\"91\",\"ListUrlMain\":\"https://doi.org/10.1080/09537287.2021.1891480\",\"RegionNum\":3,\"RegionCategory\":\"管理学\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q1\",\"JCRName\":\"ENGINEERING, INDUSTRIAL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Production Planning & Control","FirstCategoryId":"91","ListUrlMain":"https://doi.org/10.1080/09537287.2021.1891480","RegionNum":3,"RegionCategory":"管理学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"ENGINEERING, INDUSTRIAL","Score":null,"Total":0}
引用次数: 12

摘要

建设项目的总成本既包括生产成本,也包括管理项目的交易成本。然而,令人惊讶的是,我们对建设项目中交易成本的规模知之甚少。本文的目的是提供更多的经验数据,因为我们研究了建设项目的总成本中用于项目管理的比例。我们使用人体解剖学的类比来研究项目头部(管理项目)和身体(生产可交付成果)的大小。使用来自挪威134个建设项目的数据集,我们发现项目总成本平均占项目总成本的18%以上。我们还研究了项目负责人的规模如何根据项目的复杂性、规模、持续时间和烧钱率而变化。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Dissecting the project anatomy: Understanding the cost of managing construction projects
Abstract The total cost of a construction project involves both the cost of production and the transaction costs associated with managing the project. However, we know surprisingly little about the magnitude of transaction costs in construction projects. The purpose of this paper is to provide more empirical data as we study what proportion of the total cost in construction projects is spent on managing the project. We use the analogy of human anatomy as we investigate the size of a project’s head (managing the project) compared to the size of its body (producing deliverables). Using a dataset from 134 construction projects in Norway, we find that the project head consists of more than 18% of the total project cost on average. We also investigate how the size of the project head varies depending on a project’s complexity, size, duration and burn rate.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Production Planning & Control
Production Planning & Control 管理科学-工程:工业
CiteScore
19.30
自引率
9.60%
发文量
72
审稿时长
6-12 weeks
期刊介绍: Production Planning & Control is an international journal that focuses on research papers concerning operations management across industries. It emphasizes research originating from industrial needs that can provide guidance to managers and future researchers. Papers accepted by "Production Planning & Control" should address emerging industrial needs, clearly outlining the nature of the industrial problem. Any suitable research methods may be employed, and each paper should justify the method used. Case studies illustrating international significance are encouraged. Authors are encouraged to relate their work to existing knowledge in the field, particularly regarding its implications for management practice and future research agendas.
期刊最新文献
‘The rules of the game’: How business research journals discourage knowledge translation to practice and what needs to change Exploring pillars of supply chain competitiveness: insights from leading global supply chains Integrating circular economy and Industry 4.0 for sustainable supply chain management: a dynamic capability view A framework for the systematic implementation of Green-Lean and sustainability in SMEs Exploring the barriers in medical additive manufacturing from an emerging economy
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1