{"title":"某高面板堆石坝施工后安全评价","authors":"Ergin Erayman, U. S. Cavus, M. Yildiz","doi":"10.1680/jgeen.21.00167","DOIUrl":null,"url":null,"abstract":"The most important issue regarding the safety and performance of concrete face rockfill dams (CFRDs) is to determine stresses and deformations. However, predictions of crest settlements of concrete face rockfill dams (CFRDs) are usually performed by using empirical relationships. Since, in recent years, CFRDs are constructed much higher and more complicated topographical and geological dam sites, these require performing numerical analysis to evaluate the stress and deformations in the entire dam body. Numerical estimation of deformations and crest settlements is also crucial particularly to determine parapet wall heights and freeboard allowances at the design stage. In addition, assessing long-term rockfill behavior and the concrete face membrane crack potential are important for post construction dam safety. The objective of this study is to evaluate post-construction deformations and crest settlements of a high concrete faced rockfill dam under two different loading cases considering nonlinear elasto- plastic behavior of the rockfill structure. As constitutive model, Duncan-Chang hyperbolic stress-strain model was applied in finite element simulations considering the failure criterion is isotropic and hardening. Calibration of the rockfill's hyperbolic parameters was performed by comparing the calculated displacements with the actual settlement measurements from the instruments. Computed crest settlements were also compared with those of some CFRDs given in the literature. Calculated crest settlement and other deformations were in good agreement with the rockfill settlement measurements and in acceptable ranges, and do not threat the dam's safety.","PeriodicalId":54572,"journal":{"name":"Proceedings of the Institution of Civil Engineers-Geotechnical Engineering","volume":"20 1","pages":""},"PeriodicalIF":2.0000,"publicationDate":"2022-05-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Post-Construction Safety Assessment of a High Concrete Face Rockfill Dam\",\"authors\":\"Ergin Erayman, U. S. Cavus, M. Yildiz\",\"doi\":\"10.1680/jgeen.21.00167\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The most important issue regarding the safety and performance of concrete face rockfill dams (CFRDs) is to determine stresses and deformations. However, predictions of crest settlements of concrete face rockfill dams (CFRDs) are usually performed by using empirical relationships. Since, in recent years, CFRDs are constructed much higher and more complicated topographical and geological dam sites, these require performing numerical analysis to evaluate the stress and deformations in the entire dam body. Numerical estimation of deformations and crest settlements is also crucial particularly to determine parapet wall heights and freeboard allowances at the design stage. In addition, assessing long-term rockfill behavior and the concrete face membrane crack potential are important for post construction dam safety. The objective of this study is to evaluate post-construction deformations and crest settlements of a high concrete faced rockfill dam under two different loading cases considering nonlinear elasto- plastic behavior of the rockfill structure. As constitutive model, Duncan-Chang hyperbolic stress-strain model was applied in finite element simulations considering the failure criterion is isotropic and hardening. Calibration of the rockfill's hyperbolic parameters was performed by comparing the calculated displacements with the actual settlement measurements from the instruments. Computed crest settlements were also compared with those of some CFRDs given in the literature. Calculated crest settlement and other deformations were in good agreement with the rockfill settlement measurements and in acceptable ranges, and do not threat the dam's safety.\",\"PeriodicalId\":54572,\"journal\":{\"name\":\"Proceedings of the Institution of Civil Engineers-Geotechnical Engineering\",\"volume\":\"20 1\",\"pages\":\"\"},\"PeriodicalIF\":2.0000,\"publicationDate\":\"2022-05-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the Institution of Civil Engineers-Geotechnical Engineering\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.1680/jgeen.21.00167\",\"RegionNum\":4,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"ENGINEERING, GEOLOGICAL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the Institution of Civil Engineers-Geotechnical Engineering","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.1680/jgeen.21.00167","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, GEOLOGICAL","Score":null,"Total":0}
引用次数: 0

摘要

面板堆石坝的应力和变形的确定是影响面板堆石坝安全性能的关键问题。然而,混凝土面板堆石坝(cfrd)坝顶沉降的预测通常采用经验关系进行。近年来,由于cfrd的建设高度和地形、地质条件都大大提高,因此需要对整个坝体的应力和变形进行数值分析。变形和波顶沉降的数值估计也至关重要,特别是在设计阶段确定胸墙高度和干舷余量。此外,评估堆石层的长期性能和混凝土面膜裂缝电位对坝后安全具有重要意义。考虑堆石坝结构的非线性弹塑性特性,对高面板堆石坝在两种不同荷载作用下的施工后变形和坝顶沉降进行了研究。考虑各向同性和硬化破坏准则,采用Duncan-Chang双曲应力-应变模型作为本构模型进行有限元模拟。通过将计算的位移与仪器的实际沉降测量值进行比较,对堆石料的双曲参数进行了校准。计算的峰值沉降也与文献中给出的一些cfrd的计算结果进行了比较。计算的坝顶沉降及其他变形与堆石料沉降测量值吻合较好,在可接受的范围内,对大坝安全没有威胁。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Post-Construction Safety Assessment of a High Concrete Face Rockfill Dam
The most important issue regarding the safety and performance of concrete face rockfill dams (CFRDs) is to determine stresses and deformations. However, predictions of crest settlements of concrete face rockfill dams (CFRDs) are usually performed by using empirical relationships. Since, in recent years, CFRDs are constructed much higher and more complicated topographical and geological dam sites, these require performing numerical analysis to evaluate the stress and deformations in the entire dam body. Numerical estimation of deformations and crest settlements is also crucial particularly to determine parapet wall heights and freeboard allowances at the design stage. In addition, assessing long-term rockfill behavior and the concrete face membrane crack potential are important for post construction dam safety. The objective of this study is to evaluate post-construction deformations and crest settlements of a high concrete faced rockfill dam under two different loading cases considering nonlinear elasto- plastic behavior of the rockfill structure. As constitutive model, Duncan-Chang hyperbolic stress-strain model was applied in finite element simulations considering the failure criterion is isotropic and hardening. Calibration of the rockfill's hyperbolic parameters was performed by comparing the calculated displacements with the actual settlement measurements from the instruments. Computed crest settlements were also compared with those of some CFRDs given in the literature. Calculated crest settlement and other deformations were in good agreement with the rockfill settlement measurements and in acceptable ranges, and do not threat the dam's safety.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
4.40
自引率
4.50%
发文量
68
审稿时长
3 months
期刊介绍: Geotechnical Engineering provides a forum for the publication of high quality, topical and relevant technical papers covering all aspects of geotechnical research, design, construction and performance. The journal aims to be of interest to those civil, structural or geotechnical engineering practitioners wishing to develop a greater understanding of the influence of geotechnics on the built environment.
期刊最新文献
A case history of monitoring a wide pile group Part I: geology, single pile analysis and testing, and monitoring data Torsional vibration of a tapered pile considering circumferential support of surrounding soil Applicability of construction dewatering techniques for randomly fractured rock Sensitivity investigation of drilling efficiency to operational parameters of a drifter Hyperbolic load-displacement analysis of helical and expanded piles: database approach
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1