电力安装工程专业学生职业准备分析

Ridho Irawan, H. Hendri
{"title":"电力安装工程专业学生职业准备分析","authors":"Ridho Irawan, H. Hendri","doi":"10.24036/jpte.v3i1.166","DOIUrl":null,"url":null,"abstract":"The purpose of this study is to describe and analyze the work readiness of students at SMKN 2 Lubuk Basung Department of Electrical Power Installation Engineering. Work readiness refers to an individual's total physical, mental, and life experience, as well as their willingness and capacity to perform work or an activity. The research method used in this research is descriptive research method with a quantitative approach. The variable studied was the work readiness of students majoring in Electrical Power Installation Engineering, SMKN 2 Lubuk Basung. The variable studied was the work readiness of students majoring in Electrical Power Installation Engineering, SMKN 2 Lubuk Basung. The research instrument used in this study was in the form of a questionnaire which was distributed to respondents directly which had 1 variable and 7 indicators. This research questionnaire was conducted on students in class XII Electrical Power Installation Engineering with a total of 31 respondents and the results obtained were 15 respondents with poor work readiness results. The results of this study can be concluded that the work readiness of students majoring in Electrical Power Installation Engineering, SMKN 2 Lubuk Basung is categorized as bad.","PeriodicalId":31626,"journal":{"name":"Volt Jurnal Ilmiah Pendidikan Teknik Elektro","volume":"11 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-05-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Analisis Kesiapan Kerja Siswa Sekolah Menengah Kejuruan Jurusan Teknik Instalasi Tenaga Listrik\",\"authors\":\"Ridho Irawan, H. Hendri\",\"doi\":\"10.24036/jpte.v3i1.166\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The purpose of this study is to describe and analyze the work readiness of students at SMKN 2 Lubuk Basung Department of Electrical Power Installation Engineering. Work readiness refers to an individual's total physical, mental, and life experience, as well as their willingness and capacity to perform work or an activity. The research method used in this research is descriptive research method with a quantitative approach. The variable studied was the work readiness of students majoring in Electrical Power Installation Engineering, SMKN 2 Lubuk Basung. The variable studied was the work readiness of students majoring in Electrical Power Installation Engineering, SMKN 2 Lubuk Basung. The research instrument used in this study was in the form of a questionnaire which was distributed to respondents directly which had 1 variable and 7 indicators. This research questionnaire was conducted on students in class XII Electrical Power Installation Engineering with a total of 31 respondents and the results obtained were 15 respondents with poor work readiness results. The results of this study can be concluded that the work readiness of students majoring in Electrical Power Installation Engineering, SMKN 2 Lubuk Basung is categorized as bad.\",\"PeriodicalId\":31626,\"journal\":{\"name\":\"Volt Jurnal Ilmiah Pendidikan Teknik Elektro\",\"volume\":\"11 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-05-31\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Volt Jurnal Ilmiah Pendidikan Teknik Elektro\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.24036/jpte.v3i1.166\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Volt Jurnal Ilmiah Pendidikan Teknik Elektro","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24036/jpte.v3i1.166","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

本研究的目的是描述和分析SMKN 2鲁巴克巴松电力安装工程系学生的工作准备情况。工作准备是指一个人的身体、精神和生活的总体经验,以及他们进行工作或活动的意愿和能力。本研究采用的研究方法是描述性研究方法与定量研究方法相结合。所研究的变量为陆北basung SMKN 2电力安装工程专业学生的工作准备情况。所研究的变量为陆北basung SMKN 2电力安装工程专业学生的工作准备情况。本研究使用的研究工具是问卷的形式,直接分发给受访者,有1个变量和7个指标。本研究问卷以十二年级电力安装工程专业的学生为调查对象,共有31名被调查者,其中15名被调查者工作准备成绩较差。本研究结果表明,陆北basung SMKN 2电力安装工程专业学生的工作准备程度为差。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Analisis Kesiapan Kerja Siswa Sekolah Menengah Kejuruan Jurusan Teknik Instalasi Tenaga Listrik
The purpose of this study is to describe and analyze the work readiness of students at SMKN 2 Lubuk Basung Department of Electrical Power Installation Engineering. Work readiness refers to an individual's total physical, mental, and life experience, as well as their willingness and capacity to perform work or an activity. The research method used in this research is descriptive research method with a quantitative approach. The variable studied was the work readiness of students majoring in Electrical Power Installation Engineering, SMKN 2 Lubuk Basung. The variable studied was the work readiness of students majoring in Electrical Power Installation Engineering, SMKN 2 Lubuk Basung. The research instrument used in this study was in the form of a questionnaire which was distributed to respondents directly which had 1 variable and 7 indicators. This research questionnaire was conducted on students in class XII Electrical Power Installation Engineering with a total of 31 respondents and the results obtained were 15 respondents with poor work readiness results. The results of this study can be concluded that the work readiness of students majoring in Electrical Power Installation Engineering, SMKN 2 Lubuk Basung is categorized as bad.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
审稿时长
24 weeks
期刊最新文献
Perancangan PLTS Untuk Sumber Daya Lampu Penerangan Jalan Desa Iringmulyo Metro Perancangan Rangkaian Forward-Reverse pada Motor 3 Fasa Sistem Monitoring dan Kontrol Katup Pendingin terhadap Temperatur Air Outfall PLTU Pengembangan E-Modul Interaktif Instalasi Penerangan Listrik di Pendidikan Vokasi Pengembangan E-Book Pekerjaan Dasar Elektromekanik Berbasis Student Facilitator and Explaining
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1