{"title":"主喷射器萃取光束的设计","authors":"D.E. Johnson","doi":"10.1109/PAC.1999.795509","DOIUrl":null,"url":null,"abstract":"The Main Injector (MI) supports the Tevatron fixed target and proton-antiproton collider modes of operation as well as providing 120 GeV/c resonantly extracted beam for the Main Injector Fixed Target Program. A set of beam transport lines, called A1 and P1, from the Main Injector converge on the injection point of the Tevatron, with the A1 being used to transport 150 GeV/c antiprotons (pbars) to the Tevatron. P1 is used to transport 150 GeV/c protons to the Tevatron, 120 GeV/c protons to the pbar target, and eventually 120 GeV/c resonantly extracted protons to the existing Fixed Target areas.","PeriodicalId":20453,"journal":{"name":"Proceedings of the 1999 Particle Accelerator Conference (Cat. No.99CH36366)","volume":"1 1","pages":"1243-1245 vol.2"},"PeriodicalIF":0.0000,"publicationDate":"1999-07-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Design of the Main Injector extraction beamlines\",\"authors\":\"D.E. Johnson\",\"doi\":\"10.1109/PAC.1999.795509\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The Main Injector (MI) supports the Tevatron fixed target and proton-antiproton collider modes of operation as well as providing 120 GeV/c resonantly extracted beam for the Main Injector Fixed Target Program. A set of beam transport lines, called A1 and P1, from the Main Injector converge on the injection point of the Tevatron, with the A1 being used to transport 150 GeV/c antiprotons (pbars) to the Tevatron. P1 is used to transport 150 GeV/c protons to the Tevatron, 120 GeV/c protons to the pbar target, and eventually 120 GeV/c resonantly extracted protons to the existing Fixed Target areas.\",\"PeriodicalId\":20453,\"journal\":{\"name\":\"Proceedings of the 1999 Particle Accelerator Conference (Cat. No.99CH36366)\",\"volume\":\"1 1\",\"pages\":\"1243-1245 vol.2\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1999-07-07\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the 1999 Particle Accelerator Conference (Cat. No.99CH36366)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PAC.1999.795509\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the 1999 Particle Accelerator Conference (Cat. No.99CH36366)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PAC.1999.795509","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
The Main Injector (MI) supports the Tevatron fixed target and proton-antiproton collider modes of operation as well as providing 120 GeV/c resonantly extracted beam for the Main Injector Fixed Target Program. A set of beam transport lines, called A1 and P1, from the Main Injector converge on the injection point of the Tevatron, with the A1 being used to transport 150 GeV/c antiprotons (pbars) to the Tevatron. P1 is used to transport 150 GeV/c protons to the Tevatron, 120 GeV/c protons to the pbar target, and eventually 120 GeV/c resonantly extracted protons to the existing Fixed Target areas.