满足速度要求:新经济下的新产品开发和企业项目管理

R. Immelman
{"title":"满足速度要求:新经济下的新产品开发和企业项目管理","authors":"R. Immelman","doi":"10.1109/ASMC.2002.1001571","DOIUrl":null,"url":null,"abstract":"A study of enterprise-level project management reveals disparity between factors considered important for effective enterprise-level project management, and the current reality experienced by respondents. This points to unresolved systemic factors that drive unsatisfactory performance. The management of task variability, combined with a clear understanding of both task and resource dependency at project level offers an avenue to shorten project leadtime and smooth workflow. Combined with an understanding of the impact of key resource constraints across a set of projects, it is possible to improve portfolio selection and pipeline staging. By focusing on key metrics in project planning and project execution, resource utilization can be maximized and projects completed with shorter lead times.","PeriodicalId":64779,"journal":{"name":"半导体技术","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2002-08-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Fulfilling the speed imperative: new product development and enterprise project management in the new economy\",\"authors\":\"R. Immelman\",\"doi\":\"10.1109/ASMC.2002.1001571\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"A study of enterprise-level project management reveals disparity between factors considered important for effective enterprise-level project management, and the current reality experienced by respondents. This points to unresolved systemic factors that drive unsatisfactory performance. The management of task variability, combined with a clear understanding of both task and resource dependency at project level offers an avenue to shorten project leadtime and smooth workflow. Combined with an understanding of the impact of key resource constraints across a set of projects, it is possible to improve portfolio selection and pipeline staging. By focusing on key metrics in project planning and project execution, resource utilization can be maximized and projects completed with shorter lead times.\",\"PeriodicalId\":64779,\"journal\":{\"name\":\"半导体技术\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2002-08-07\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"半导体技术\",\"FirstCategoryId\":\"1087\",\"ListUrlMain\":\"https://doi.org/10.1109/ASMC.2002.1001571\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"半导体技术","FirstCategoryId":"1087","ListUrlMain":"https://doi.org/10.1109/ASMC.2002.1001571","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

一项对企业级项目管理的研究表明,对于有效的企业级项目管理来说,被认为重要的因素与受访者目前所经历的现实之间存在差异。这指出了导致业绩不理想的未解决的系统性因素。对任务可变性的管理,结合对项目级别的任务和资源依赖关系的清晰理解,提供了缩短项目交付时间和平滑工作流程的途径。结合对一组项目中关键资源约束影响的理解,就有可能改进投资组合选择和管道分期。通过关注项目计划和项目执行中的关键指标,可以最大限度地利用资源,并在更短的交货时间内完成项目。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Fulfilling the speed imperative: new product development and enterprise project management in the new economy
A study of enterprise-level project management reveals disparity between factors considered important for effective enterprise-level project management, and the current reality experienced by respondents. This points to unresolved systemic factors that drive unsatisfactory performance. The management of task variability, combined with a clear understanding of both task and resource dependency at project level offers an avenue to shorten project leadtime and smooth workflow. Combined with an understanding of the impact of key resource constraints across a set of projects, it is possible to improve portfolio selection and pipeline staging. By focusing on key metrics in project planning and project execution, resource utilization can be maximized and projects completed with shorter lead times.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
8436
期刊最新文献
A manufacturable shallow trench isolation process for sub-0.2 um DRAM technologies Ultra-dilute silicon wafer clean chemistry for fabrication of RF microwave devices Planarization yield limiters for wafer-scale 3D ICs Statistical modeling and analysis of wafer test fail counts An approach for improving yield with intentional defects
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1