{"title":"具有时间延迟的定向通信网络的分布式减载","authors":"Tao Yang, Di Wu","doi":"10.1109/TDC.2016.7519859","DOIUrl":null,"url":null,"abstract":"When generation is insufficient to support all loads in a power system under emergencies, effective and efficient load shedding needs to be deployed in order to prevent system collapse. This paper presents a ratio consensus based distributed algorithm to discover the system overload after disturbance. In the proposed algorithm, the agent at each bus only communicates with its neighboring agents via directed communication links possibly with arbitrarily large but bounded time-varying communication delays. Simulation results are used to validate the proposed method.","PeriodicalId":6497,"journal":{"name":"2016 IEEE/PES Transmission and Distribution Conference and Exposition (T&D)","volume":"244 1","pages":"1-5"},"PeriodicalIF":0.0000,"publicationDate":"2016-05-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Distributed load shedding over directed communication networks with time delays\",\"authors\":\"Tao Yang, Di Wu\",\"doi\":\"10.1109/TDC.2016.7519859\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"When generation is insufficient to support all loads in a power system under emergencies, effective and efficient load shedding needs to be deployed in order to prevent system collapse. This paper presents a ratio consensus based distributed algorithm to discover the system overload after disturbance. In the proposed algorithm, the agent at each bus only communicates with its neighboring agents via directed communication links possibly with arbitrarily large but bounded time-varying communication delays. Simulation results are used to validate the proposed method.\",\"PeriodicalId\":6497,\"journal\":{\"name\":\"2016 IEEE/PES Transmission and Distribution Conference and Exposition (T&D)\",\"volume\":\"244 1\",\"pages\":\"1-5\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2016-05-03\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2016 IEEE/PES Transmission and Distribution Conference and Exposition (T&D)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/TDC.2016.7519859\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2016 IEEE/PES Transmission and Distribution Conference and Exposition (T&D)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TDC.2016.7519859","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Distributed load shedding over directed communication networks with time delays
When generation is insufficient to support all loads in a power system under emergencies, effective and efficient load shedding needs to be deployed in order to prevent system collapse. This paper presents a ratio consensus based distributed algorithm to discover the system overload after disturbance. In the proposed algorithm, the agent at each bus only communicates with its neighboring agents via directed communication links possibly with arbitrarily large but bounded time-varying communication delays. Simulation results are used to validate the proposed method.