{"title":"具有时间延迟的定向通信网络的分布式减载","authors":"Tao Yang, Di Wu","doi":"10.1109/TDC.2016.7519859","DOIUrl":null,"url":null,"abstract":"When generation is insufficient to support all loads in a power system under emergencies, effective and efficient load shedding needs to be deployed in order to prevent system collapse. This paper presents a ratio consensus based distributed algorithm to discover the system overload after disturbance. In the proposed algorithm, the agent at each bus only communicates with its neighboring agents via directed communication links possibly with arbitrarily large but bounded time-varying communication delays. Simulation results are used to validate the proposed method.","PeriodicalId":6497,"journal":{"name":"2016 IEEE/PES Transmission and Distribution Conference and Exposition (T&D)","volume":"244 1","pages":"1-5"},"PeriodicalIF":0.0000,"publicationDate":"2016-05-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Distributed load shedding over directed communication networks with time delays\",\"authors\":\"Tao Yang, Di Wu\",\"doi\":\"10.1109/TDC.2016.7519859\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"When generation is insufficient to support all loads in a power system under emergencies, effective and efficient load shedding needs to be deployed in order to prevent system collapse. This paper presents a ratio consensus based distributed algorithm to discover the system overload after disturbance. In the proposed algorithm, the agent at each bus only communicates with its neighboring agents via directed communication links possibly with arbitrarily large but bounded time-varying communication delays. Simulation results are used to validate the proposed method.\",\"PeriodicalId\":6497,\"journal\":{\"name\":\"2016 IEEE/PES Transmission and Distribution Conference and Exposition (T&D)\",\"volume\":\"244 1\",\"pages\":\"1-5\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2016-05-03\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2016 IEEE/PES Transmission and Distribution Conference and Exposition (T&D)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/TDC.2016.7519859\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2016 IEEE/PES Transmission and Distribution Conference and Exposition (T&D)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TDC.2016.7519859","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

在紧急情况下,当发电能力不足以支持电力系统的所有负荷时,需要采取有效、高效的减载措施,以防止系统崩溃。提出了一种基于比例一致性的分布式算法来发现扰动后的系统过载。在该算法中,每个总线上的代理仅通过定向通信链路与其相邻代理进行通信,可能具有任意大但有界的时变通信延迟。仿真结果验证了该方法的有效性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Distributed load shedding over directed communication networks with time delays
When generation is insufficient to support all loads in a power system under emergencies, effective and efficient load shedding needs to be deployed in order to prevent system collapse. This paper presents a ratio consensus based distributed algorithm to discover the system overload after disturbance. In the proposed algorithm, the agent at each bus only communicates with its neighboring agents via directed communication links possibly with arbitrarily large but bounded time-varying communication delays. Simulation results are used to validate the proposed method.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Fast evaluation of probabilistic total transfer capability considering multiple wind farms An automated model based fault locating method for distribution systems Fault location identification of a hybrid HVDC-VSC system containing cable and overhead line segments using transient data Conductor corrosion inspection of aluminum conductor steel reinforced transmission lines Microgrid load management and control strategies
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1