{"title":"欧盟资助的研究和发展项目的项目管理过程数字化热图","authors":"Miro Hegedic, Petar Gregurić, Darko Liović, Jakov Bošnjak","doi":"10.5592/co/senet.2022.14","DOIUrl":null,"url":null,"abstract":"Today, EU projects represent a significant factor in growth and progress of the Croatian economy. Since Croatia joined the European Union, it has utilised a significant amount of HRK for research and development projects. Research and development projects have a long lead time—over four years on average—from the beginning of the idea to the end of implementation. Several stakeholders are involved in the process, including institutions, academia, SMEs, and consulting firms. The level of readiness of the process for digitalisation varies depending on the project lifecycle phase. Since digitalisation is widely recognized as the key to success in service businesses, this study aims to establish a digitalisation heatmap for administrative and operational processes in the EU-funded research and development project lifecycle and recognize opportunities for digitalisation of the process. Data were collected through an empirical study of EU-funded project. Taken together, these findings suggest that there is a potential for further digitisation of the process, especially for consultants in the implementation phase and communication with the client as well as in state institutions. Further research should focus on identified subprocesses to successfully develop a methodology to increase digitisation readiness and on extraordinary circumstances that result in changes of lesser or greater significance to the project.","PeriodicalId":64912,"journal":{"name":"建设监理","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2023-07-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Project Management Process Digitalization Heatmap in EU Funded Research and Development Projects\",\"authors\":\"Miro Hegedic, Petar Gregurić, Darko Liović, Jakov Bošnjak\",\"doi\":\"10.5592/co/senet.2022.14\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Today, EU projects represent a significant factor in growth and progress of the Croatian economy. Since Croatia joined the European Union, it has utilised a significant amount of HRK for research and development projects. Research and development projects have a long lead time—over four years on average—from the beginning of the idea to the end of implementation. Several stakeholders are involved in the process, including institutions, academia, SMEs, and consulting firms. The level of readiness of the process for digitalisation varies depending on the project lifecycle phase. Since digitalisation is widely recognized as the key to success in service businesses, this study aims to establish a digitalisation heatmap for administrative and operational processes in the EU-funded research and development project lifecycle and recognize opportunities for digitalisation of the process. Data were collected through an empirical study of EU-funded project. Taken together, these findings suggest that there is a potential for further digitisation of the process, especially for consultants in the implementation phase and communication with the client as well as in state institutions. Further research should focus on identified subprocesses to successfully develop a methodology to increase digitisation readiness and on extraordinary circumstances that result in changes of lesser or greater significance to the project.\",\"PeriodicalId\":64912,\"journal\":{\"name\":\"建设监理\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-07-06\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"建设监理\",\"FirstCategoryId\":\"1087\",\"ListUrlMain\":\"https://doi.org/10.5592/co/senet.2022.14\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"建设监理","FirstCategoryId":"1087","ListUrlMain":"https://doi.org/10.5592/co/senet.2022.14","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

今天,欧盟项目是克罗地亚经济增长和进步的一个重要因素。自从克罗地亚加入欧洲联盟以来,它已将大量人权资源用于研究和发展项目。研究和开发项目有很长的准备时间——从想法的开始到实施的结束,平均要4年以上。几个利益相关者参与了这个过程,包括机构、学术界、中小企业和咨询公司。数字化过程的准备程度取决于项目生命周期阶段。由于数字化被广泛认为是服务业成功的关键,本研究旨在为欧盟资助的研发项目生命周期中的行政和运营流程建立数字化热图,并识别流程数字化的机会。通过对欧盟资助项目的实证研究收集数据。综上所述,这些发现表明,这一过程有进一步数字化的潜力,特别是对于实施阶段的顾问以及与客户和国家机构的沟通而言。进一步的研究应该集中在确定的子过程上,以成功地开发一种方法来增加数字化准备,以及导致对项目或多或少意义变化的特殊情况。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Project Management Process Digitalization Heatmap in EU Funded Research and Development Projects
Today, EU projects represent a significant factor in growth and progress of the Croatian economy. Since Croatia joined the European Union, it has utilised a significant amount of HRK for research and development projects. Research and development projects have a long lead time—over four years on average—from the beginning of the idea to the end of implementation. Several stakeholders are involved in the process, including institutions, academia, SMEs, and consulting firms. The level of readiness of the process for digitalisation varies depending on the project lifecycle phase. Since digitalisation is widely recognized as the key to success in service businesses, this study aims to establish a digitalisation heatmap for administrative and operational processes in the EU-funded research and development project lifecycle and recognize opportunities for digitalisation of the process. Data were collected through an empirical study of EU-funded project. Taken together, these findings suggest that there is a potential for further digitisation of the process, especially for consultants in the implementation phase and communication with the client as well as in state institutions. Further research should focus on identified subprocesses to successfully develop a methodology to increase digitisation readiness and on extraordinary circumstances that result in changes of lesser or greater significance to the project.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
8035
期刊最新文献
An Integrated Solution for increased Circularity in Buidings: A Method Framework for Research on Communication in Multicultural Projects: The Case of Pelješac Bridge What are the Special Usances in Construction? Impact of Project Manager and Team Member Characteristics on Their Personal Growth and Satisfaction The Importance of Urban Spatial Grid Data in the Building Valuation Process
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1