影响尼日利亚油气项目交付的因素:成本管理视角

Asuquo Henry Okpo, Ukpong Nsemo Sylvester, Jima Offiong
{"title":"影响尼日利亚油气项目交付的因素:成本管理视角","authors":"Asuquo Henry Okpo, Ukpong Nsemo Sylvester, Jima Offiong","doi":"10.11648/j.ijem.20230701.11","DOIUrl":null,"url":null,"abstract":": Overtime, cost management of construction projects in the Nigeria oil and gas sector has been branded inadequate with critical stakeholders standing aloof from offering requisite expertise to achieve efficiency. Based on pertinent lack of critical literature narrative about the practice of cost management in the oil and gas sector generally and in Nigeria specifically, this study evaluated the issues inhibiting cost management of oil refinery. Using a purposive sample size of 36 construction professionals in the oil and gas sector obtained through snowballing in Rivers state, Nigeria, structured questionnaire was employed to collect data that were analysed using mean item score and Chi-Square. The result revealed that issues dealing with low education, skills, estimating efficiency, non-involvement of core cost management professionals and change in scope as critical issues for affecting the efficiency of cost management in oil refinery construction projects. All the 25 factors evaluated were significant mean item scores (3.01 - 3.94) and the null hypothesis was rejected (p-values < 0.000) to show the consistency of the mean ranking. The study buttresses that inadequate cost management practice in the Nigerian oil and gas sector is due to this range of factors. Recommendations towards improving the state of cost management practice in the sector are directed towards the need to improve the validated barriers as precursors of inefficiencies in the sector.","PeriodicalId":45882,"journal":{"name":"International Journal of Engineering Business Management","volume":null,"pages":null},"PeriodicalIF":4.9000,"publicationDate":"2023-05-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Factors Influencing Oil and Gas Project Delivery in Nigeria: Cost Management Perspective\",\"authors\":\"Asuquo Henry Okpo, Ukpong Nsemo Sylvester, Jima Offiong\",\"doi\":\"10.11648/j.ijem.20230701.11\",\"DOIUrl\":null,\"url\":null,\"abstract\":\": Overtime, cost management of construction projects in the Nigeria oil and gas sector has been branded inadequate with critical stakeholders standing aloof from offering requisite expertise to achieve efficiency. Based on pertinent lack of critical literature narrative about the practice of cost management in the oil and gas sector generally and in Nigeria specifically, this study evaluated the issues inhibiting cost management of oil refinery. Using a purposive sample size of 36 construction professionals in the oil and gas sector obtained through snowballing in Rivers state, Nigeria, structured questionnaire was employed to collect data that were analysed using mean item score and Chi-Square. The result revealed that issues dealing with low education, skills, estimating efficiency, non-involvement of core cost management professionals and change in scope as critical issues for affecting the efficiency of cost management in oil refinery construction projects. All the 25 factors evaluated were significant mean item scores (3.01 - 3.94) and the null hypothesis was rejected (p-values < 0.000) to show the consistency of the mean ranking. The study buttresses that inadequate cost management practice in the Nigerian oil and gas sector is due to this range of factors. Recommendations towards improving the state of cost management practice in the sector are directed towards the need to improve the validated barriers as precursors of inefficiencies in the sector.\",\"PeriodicalId\":45882,\"journal\":{\"name\":\"International Journal of Engineering Business Management\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":4.9000,\"publicationDate\":\"2023-05-17\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Engineering Business Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.11648/j.ijem.20230701.11\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q1\",\"JCRName\":\"BUSINESS\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Engineering Business Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.11648/j.ijem.20230701.11","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"BUSINESS","Score":null,"Total":0}
引用次数: 0

摘要

加班,尼日利亚石油和天然气行业建设项目的成本管理被认为是不足的,关键利益相关者远离提供必要的专业知识以实现效率。由于缺乏对石油和天然气行业成本管理实践的相关批判性文献叙述,特别是在尼日利亚,本研究评估了阻碍炼油厂成本管理的问题。通过滚雪球法在尼日利亚Rivers州获得36名石油和天然气行业的建筑专业人员作为有目的的样本量,采用结构化问卷收集数据,并使用平均项目得分和卡方分析。结果表明,影响炼油厂建设项目成本管理效率的关键问题是教育程度低、技能水平低、估算效率低、核心成本管理专业人员不参与、范围变化等问题。评价的25个因素均为显著平均项目得分(3.01 ~ 3.94),拒绝原假设(p值< 0.000),显示平均排名的一致性。该研究支持了尼日利亚石油和天然气行业成本管理实践不足是由于这一系列因素造成的。关于改善该部门成本管理做法状况的建议是针对需要改善作为该部门效率低下前兆的已证实的障碍。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Factors Influencing Oil and Gas Project Delivery in Nigeria: Cost Management Perspective
: Overtime, cost management of construction projects in the Nigeria oil and gas sector has been branded inadequate with critical stakeholders standing aloof from offering requisite expertise to achieve efficiency. Based on pertinent lack of critical literature narrative about the practice of cost management in the oil and gas sector generally and in Nigeria specifically, this study evaluated the issues inhibiting cost management of oil refinery. Using a purposive sample size of 36 construction professionals in the oil and gas sector obtained through snowballing in Rivers state, Nigeria, structured questionnaire was employed to collect data that were analysed using mean item score and Chi-Square. The result revealed that issues dealing with low education, skills, estimating efficiency, non-involvement of core cost management professionals and change in scope as critical issues for affecting the efficiency of cost management in oil refinery construction projects. All the 25 factors evaluated were significant mean item scores (3.01 - 3.94) and the null hypothesis was rejected (p-values < 0.000) to show the consistency of the mean ranking. The study buttresses that inadequate cost management practice in the Nigerian oil and gas sector is due to this range of factors. Recommendations towards improving the state of cost management practice in the sector are directed towards the need to improve the validated barriers as precursors of inefficiencies in the sector.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
7.50
自引率
6.10%
发文量
17
审稿时长
15 weeks
期刊介绍: The International Journal of Engineering Business Management (IJEBM) is an international, peer-reviewed, open access scientific journal that aims to promote an integrated and multidisciplinary approach to engineering, business and management. The journal focuses on issues related to the design, development and implementation of new methodologies and technologies that contribute to strategic and operational improvements of organizations within the contemporary global business environment. IJEBM encourages a systematic and holistic view in order to ensure an integrated and economically, socially and environmentally friendly approach to management of new technologies in business. It aims to be a world-class research platform for academics, managers, and professionals to publish scholarly research in the global arena. All submitted articles considered suitable for the International Journal of Engineering Business Management are subjected to rigorous peer review to ensure the highest levels of quality. The review process is carried out as quickly as possible to minimize any delays in the online publication of articles. Topics of interest include, but are not limited to: -Competitive product design and innovation -Operations and manufacturing strategy -Knowledge management and knowledge innovation -Information and decision support systems -Radio Frequency Identification -Wireless Sensor Networks -Industrial engineering for business improvement -Logistics engineering and transportation -Modeling and simulation of industrial and business systems -Quality management and Six Sigma -Automation of industrial processes and systems -Manufacturing performance and productivity measurement -Supply Chain Management and the virtual enterprise network -Environmental, legal and social aspects -Technology Capital and Financial Modelling -Engineering Economics and Investment Theory -Behavioural, Social and Political factors in Engineering
期刊最新文献
Configurational risks and innovation performance of complex product systems development: A fsQCA lens Entrepreneurship environments and entrepreneurial intention- the role of self efficacy and role model Integrating human factors into the distribution model of goods and fast-moving consumer goods for effective inventory control Towards a framework for successful metaverse adoption in Small and Medium-sized Enterprises: An exploratory study Digital supply chain transformation: The role of smart technologies on operational performance in manufacturing industry
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1