{"title":"分析排水管道的容量,亚伦·索哈尔·马镇自然围栏镇","authors":"Remi Ayu Manda Sari, Lily Endah Diansari, Fameira Dhiniati","doi":"10.36050/berings.v8i02.409","DOIUrl":null,"url":null,"abstract":"Drainage is a very important infrastructure for an area. Increasing population causes changes in land use resulting in reduced land infiltration and increased runoff. As happened in the drainage channel of Jalan Mayjen Harun Sohar in the rainy season. Drainage often overflowed and flooded people's homes. The purpose of this study is to analyze the capacity of drainage channels on Jalan Mayjen Harun Sohar Kota Pagar Alam. Calculation of Rainfall Intensity using the Mononobe equation. calculation of flood discharge plan based on the Rational method. Distribution of rainfall that is suitable in this study area is to use the gumbell method after being tested with the distribution match using the Chi-squared and Smirnov-Kolmogrov method with a planned rainfall Tr50 = 175.72 mm / hour, so the amount of existing Q = 3,563 m3 / sec and the magnitude of the planned flood discharge Q50 = 2,261 m3 / sec. It was concluded that the capacity of the drainage channel on Jalan Mayje  Harun Sohar street was still able to accommodate the planned flood discharge but to avoid detention a dredging of 0.50 m was carried out","PeriodicalId":17796,"journal":{"name":"JURNAL ILMIAH BERING'S","volume":"4 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2021-10-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"ANALISIS KAPASITAS SALURAN DRAINASE JALAN MAYJEN HARUN SOHAR KOTA PAGAR ALAM\",\"authors\":\"Remi Ayu Manda Sari, Lily Endah Diansari, Fameira Dhiniati\",\"doi\":\"10.36050/berings.v8i02.409\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Drainage is a very important infrastructure for an area. Increasing population causes changes in land use resulting in reduced land infiltration and increased runoff. As happened in the drainage channel of Jalan Mayjen Harun Sohar in the rainy season. Drainage often overflowed and flooded people's homes. The purpose of this study is to analyze the capacity of drainage channels on Jalan Mayjen Harun Sohar Kota Pagar Alam. Calculation of Rainfall Intensity using the Mononobe equation. calculation of flood discharge plan based on the Rational method. Distribution of rainfall that is suitable in this study area is to use the gumbell method after being tested with the distribution match using the Chi-squared and Smirnov-Kolmogrov method with a planned rainfall Tr50 = 175.72 mm / hour, so the amount of existing Q = 3,563 m3 / sec and the magnitude of the planned flood discharge Q50 = 2,261 m3 / sec. It was concluded that the capacity of the drainage channel on Jalan Mayje  Harun Sohar street was still able to accommodate the planned flood discharge but to avoid detention a dredging of 0.50 m was carried out\",\"PeriodicalId\":17796,\"journal\":{\"name\":\"JURNAL ILMIAH BERING'S\",\"volume\":\"4 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-10-13\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"JURNAL ILMIAH BERING'S\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.36050/berings.v8i02.409\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"JURNAL ILMIAH BERING'S","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.36050/berings.v8i02.409","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

排水系统是一个地区非常重要的基础设施。人口增加引起土地利用的变化,导致土地入渗减少和径流增加。就像雨季发生在Jalan Mayjen Harun Sohar的排水通道一样。排水系统经常泛滥,淹没人们的家园。本研究的目的是分析Jalan Mayjen Harun Sohar Kota Pagar Alam的排水渠道的容量。利用Mononobe方程计算降雨强度。基于Rational方法的泄洪方案计算。在计划降雨量Tr50 = 175.72 mm / h下,通过卡方法和Smirnov-Kolmogrov法进行分布匹配检验后,采用gumbell法进行适合本研究区域的降雨分布。因此,现有水量Q = 3563立方米/秒,计划泄洪量Q50 = 2261立方米/秒。得出的结论是,Jalan Mayje Harun Sohar街的排水渠道的容量仍然能够容纳计划泄洪,但为了避免滞留,进行了0.50米的疏浚
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
ANALISIS KAPASITAS SALURAN DRAINASE JALAN MAYJEN HARUN SOHAR KOTA PAGAR ALAM
Drainage is a very important infrastructure for an area. Increasing population causes changes in land use resulting in reduced land infiltration and increased runoff. As happened in the drainage channel of Jalan Mayjen Harun Sohar in the rainy season. Drainage often overflowed and flooded people's homes. The purpose of this study is to analyze the capacity of drainage channels on Jalan Mayjen Harun Sohar Kota Pagar Alam. Calculation of Rainfall Intensity using the Mononobe equation. calculation of flood discharge plan based on the Rational method. Distribution of rainfall that is suitable in this study area is to use the gumbell method after being tested with the distribution match using the Chi-squared and Smirnov-Kolmogrov method with a planned rainfall Tr50 = 175.72 mm / hour, so the amount of existing Q = 3,563 m3 / sec and the magnitude of the planned flood discharge Q50 = 2,261 m3 / sec. It was concluded that the capacity of the drainage channel on Jalan Mayje  Harun Sohar street was still able to accommodate the planned flood discharge but to avoid detention a dredging of 0.50 m was carried out
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
PEMANFAATAN BIJI KARET SEBAGAI AGREGAT KASAR TERHADAP WORKABILITY DAN KUAT TEKAN BETON SCC (SELF COMPACTING CONCRETE) PENILAIAN INDEKS ANCAMAN KEKERINGAN DI KECAMATAN DEMPO TENGAH KOTA PAGARALAM MENGGUNAKAN GIS PEMANFAATAN PASIR PUTIH SEBAGAI BAHAN PEMBUATAN BETON MUTU TINGGI FEASIBILITY STUDY (STUDI KELAYAKAN) PERENCANAAN PEMBANGUNAN TPS 3R DI PULAU SABIRA KABUPATEN KEPULAUAN SERIBU PROVINSI DKI JAKARTA) PENENTUAN PRIORITAS PENANGANAN LOKASI KUMUH PERKOTAAN DI KOTA PAGAR ALAM
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1