校企合作开发集成生产计划软件系统

M. Turnquist
{"title":"校企合作开发集成生产计划软件系统","authors":"M. Turnquist","doi":"10.1109/PICMET.1991.183691","DOIUrl":null,"url":null,"abstract":"Over the last two years, teams of Master's level students at Cornell, working together with the Production Control staff at the Battery Strategic Business Unit of Delco Remy, have created an integrated microcomputer-based software system for planning battery production. The system includes elements for demand forecasting, order allocation among multiple plants, and dynamic production scheduling within each plant to balance inventor and overtime labor in the presence of a highly seasonal demand pattern. On the academic side, the students have benefited by having their required project work focus on a very real problem. On the industrial side, Delco Remy has obtained a system which represents state-of-the-art methods, and which is implemented and working.<<ETX>>","PeriodicalId":22349,"journal":{"name":"Technology Management : the New International Language","volume":"3 1","pages":"456-459"},"PeriodicalIF":0.0000,"publicationDate":"1991-10-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"University/industry cooperation on an integrated production planning software system\",\"authors\":\"M. Turnquist\",\"doi\":\"10.1109/PICMET.1991.183691\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Over the last two years, teams of Master's level students at Cornell, working together with the Production Control staff at the Battery Strategic Business Unit of Delco Remy, have created an integrated microcomputer-based software system for planning battery production. The system includes elements for demand forecasting, order allocation among multiple plants, and dynamic production scheduling within each plant to balance inventor and overtime labor in the presence of a highly seasonal demand pattern. On the academic side, the students have benefited by having their required project work focus on a very real problem. On the industrial side, Delco Remy has obtained a system which represents state-of-the-art methods, and which is implemented and working.<<ETX>>\",\"PeriodicalId\":22349,\"journal\":{\"name\":\"Technology Management : the New International Language\",\"volume\":\"3 1\",\"pages\":\"456-459\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1991-10-27\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Technology Management : the New International Language\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PICMET.1991.183691\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Technology Management : the New International Language","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PICMET.1991.183691","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

摘要

在过去的两年里,康奈尔大学的硕士生团队与Delco Remy电池战略业务部门的生产控制人员合作,创建了一个集成的基于微机的软件系统,用于规划电池生产。该系统包括需求预测、多个工厂之间的订单分配和每个工厂内的动态生产调度等要素,以平衡在高度季节性需求模式下的发明和加班劳动。在学术方面,学生们受益于他们所要求的项目工作集中在一个非常现实的问题上。在工业方面,Delco Remy已经获得了一个代表最先进方法的系统,并且该系统正在实施和工作。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
University/industry cooperation on an integrated production planning software system
Over the last two years, teams of Master's level students at Cornell, working together with the Production Control staff at the Battery Strategic Business Unit of Delco Remy, have created an integrated microcomputer-based software system for planning battery production. The system includes elements for demand forecasting, order allocation among multiple plants, and dynamic production scheduling within each plant to balance inventor and overtime labor in the presence of a highly seasonal demand pattern. On the academic side, the students have benefited by having their required project work focus on a very real problem. On the industrial side, Delco Remy has obtained a system which represents state-of-the-art methods, and which is implemented and working.<>
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Defining the modernization capabilities of the small and medium-sized businesses Knowledge building and concurrent engineering in manufacturing automation Measuring project progress by work sampling An empirical investigation of the relationship between science, technology, and total factor productivity growth rate Strategic technology planning-developing roadmaps for competitive advantage
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1