管理产品开发过程中多个活动的并发执行

Gyesik Oh, Y. Hong
{"title":"管理产品开发过程中多个活动的并发执行","authors":"Gyesik Oh, Y. Hong","doi":"10.1177/1063293X20957994","DOIUrl":null,"url":null,"abstract":"Many companies adopt concurrent engineering in their product-development projects in order to reduce time to market. Concurrent engineering requires careful management, since the uncertainty of transferred information leads to rework and renders a development process complex. Most of the existing studies on concurrent engineering have analyzed overlapping between two activities. The present study expanded the research scope by modeling the developmental process of the concurrent execution of multiple activities as the result of management decisions, the overlapping ratio, and the information transfer frequency. When multiple activities are overlapped, it is more difficult to model a development process, since the uncertainty of cascaded information has impacts on many activities. The quantitative model developed in the present study provides insights into the uncertainty of information and the product-development process. Based on the generalized process model for multiple-activity overlapping, the optimal decision to minimize project duration was considered. As a solution to the dilemma of the high computational burden of considering all feasible decision sets, this paper proposes a myopic heuristic. The project management heuristic proposed in this paper is intended to assist managers in the decision-making process, as well as reducing the intermediate deadlines in project main plan.","PeriodicalId":10680,"journal":{"name":"Concurrent Engineering","volume":"34 1","pages":"210 - 221"},"PeriodicalIF":0.0000,"publicationDate":"2020-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":"{\"title\":\"Managing concurrent execution of multiple activities in product development process\",\"authors\":\"Gyesik Oh, Y. Hong\",\"doi\":\"10.1177/1063293X20957994\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Many companies adopt concurrent engineering in their product-development projects in order to reduce time to market. Concurrent engineering requires careful management, since the uncertainty of transferred information leads to rework and renders a development process complex. Most of the existing studies on concurrent engineering have analyzed overlapping between two activities. The present study expanded the research scope by modeling the developmental process of the concurrent execution of multiple activities as the result of management decisions, the overlapping ratio, and the information transfer frequency. When multiple activities are overlapped, it is more difficult to model a development process, since the uncertainty of cascaded information has impacts on many activities. The quantitative model developed in the present study provides insights into the uncertainty of information and the product-development process. Based on the generalized process model for multiple-activity overlapping, the optimal decision to minimize project duration was considered. As a solution to the dilemma of the high computational burden of considering all feasible decision sets, this paper proposes a myopic heuristic. The project management heuristic proposed in this paper is intended to assist managers in the decision-making process, as well as reducing the intermediate deadlines in project main plan.\",\"PeriodicalId\":10680,\"journal\":{\"name\":\"Concurrent Engineering\",\"volume\":\"34 1\",\"pages\":\"210 - 221\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-09-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"5\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Concurrent Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1177/1063293X20957994\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Concurrent Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1177/1063293X20957994","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 5

摘要

许多公司在其产品开发项目中采用并行工程,以缩短产品上市时间。并行工程需要仔细的管理,因为传递信息的不确定性会导致返工,并使开发过程变得复杂。现有的并行工程研究大多分析了两个活动之间的重叠。本研究通过对管理决策、重叠率、信息传递频率等因素对多活动并发执行的发展过程进行建模,拓展了研究范围。当多个活动重叠时,由于级联信息的不确定性会对许多活动产生影响,因此对开发过程建模更加困难。本研究建立的定量模型提供了对信息不确定性和产品开发过程的见解。基于多活动重叠的广义过程模型,考虑了最小化项目工期的最优决策。为了解决考虑所有可行决策集的计算量大的困境,本文提出了一种近视启发式算法。本文提出的项目管理启发式方法旨在帮助管理者进行决策,并减少项目主计划中的中间期限。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Managing concurrent execution of multiple activities in product development process
Many companies adopt concurrent engineering in their product-development projects in order to reduce time to market. Concurrent engineering requires careful management, since the uncertainty of transferred information leads to rework and renders a development process complex. Most of the existing studies on concurrent engineering have analyzed overlapping between two activities. The present study expanded the research scope by modeling the developmental process of the concurrent execution of multiple activities as the result of management decisions, the overlapping ratio, and the information transfer frequency. When multiple activities are overlapped, it is more difficult to model a development process, since the uncertainty of cascaded information has impacts on many activities. The quantitative model developed in the present study provides insights into the uncertainty of information and the product-development process. Based on the generalized process model for multiple-activity overlapping, the optimal decision to minimize project duration was considered. As a solution to the dilemma of the high computational burden of considering all feasible decision sets, this paper proposes a myopic heuristic. The project management heuristic proposed in this paper is intended to assist managers in the decision-making process, as well as reducing the intermediate deadlines in project main plan.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Sensitivity study of process parameters of wire arc additive manufacturing using probabilistic deep learning and uncertainty quantification Retraction Notice Decision-making solutions based artificial intelligence and hybrid software for optimal sizing and energy management in a smart grid system Harness collaboration between manufacturing Small and medium-sized enterprises through a collaborative platform based on the business model canvas Research on the evolution law of cloud manufacturing service ecosystem based on multi-agent behavior simulation
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1