{"title":"农业发展项目中监测和评价活动的分类和组织","authors":"Andrew Dorward","doi":"10.1016/0269-7475(88)90052-9","DOIUrl":null,"url":null,"abstract":"<div><p>Despite an increasing literature on monitoring and evaluation (M &amp; E), no consensus has been reached on terminology, methodology, and the place of monitoring and evaluation activities in agricultural development projects. Any discussion of monitoring and evaluation activities must start with consideration of the planning and management cycle, of the anticipated sequence of project outputs, effects and impact flowing from project inputs, and of the different people involved in this sequence. From this basis, a more comprehensive terminology is suggested for different monitoring and evaluation activities, and organisational structures are proposed, to aid effective integration of monitoring, evaluation, planning and management. Finally, it is argued that project planning should give much more explicit and detailed attention to M &amp; E activities.</p></div>","PeriodicalId":100060,"journal":{"name":"Agricultural Administration and Extension","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"1988-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/0269-7475(88)90052-9","citationCount":"2","resultStr":"{\"title\":\"The classification and organisation of monitoring and evaluation activities in agricultural development projects\",\"authors\":\"Andrew Dorward\",\"doi\":\"10.1016/0269-7475(88)90052-9\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<div><p>Despite an increasing literature on monitoring and evaluation (M &amp; E), no consensus has been reached on terminology, methodology, and the place of monitoring and evaluation activities in agricultural development projects. Any discussion of monitoring and evaluation activities must start with consideration of the planning and management cycle, of the anticipated sequence of project outputs, effects and impact flowing from project inputs, and of the different people involved in this sequence. From this basis, a more comprehensive terminology is suggested for different monitoring and evaluation activities, and organisational structures are proposed, to aid effective integration of monitoring, evaluation, planning and management. Finally, it is argued that project planning should give much more explicit and detailed attention to M &amp; E activities.</p></div>\",\"PeriodicalId\":100060,\"journal\":{\"name\":\"Agricultural Administration and Extension\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1988-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://sci-hub-pdf.com/10.1016/0269-7475(88)90052-9\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Agricultural Administration and Extension\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://www.sciencedirect.com/science/article/pii/0269747588900529\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Agricultural Administration and Extension","FirstCategoryId":"1085","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/0269747588900529","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

尽管关于监测和评估的文献越来越多(M &E)在农业发展项目的术语、方法以及监测和评估活动的位置上没有达成共识。任何关于监测和评价活动的讨论都必须首先考虑规划和管理周期、项目产出的预期顺序、项目投入产生的效果和影响以及参与这一顺序的不同人员。在此基础上,为不同的监测和评价活动提出了更全面的术语,并提出了组织结构,以帮助有效地将监测、评价、规划和管理结合起来。最后,本文认为,项目规划应更加明确和详细地关注m&E活动。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
The classification and organisation of monitoring and evaluation activities in agricultural development projects

Despite an increasing literature on monitoring and evaluation (M & E), no consensus has been reached on terminology, methodology, and the place of monitoring and evaluation activities in agricultural development projects. Any discussion of monitoring and evaluation activities must start with consideration of the planning and management cycle, of the anticipated sequence of project outputs, effects and impact flowing from project inputs, and of the different people involved in this sequence. From this basis, a more comprehensive terminology is suggested for different monitoring and evaluation activities, and organisational structures are proposed, to aid effective integration of monitoring, evaluation, planning and management. Finally, it is argued that project planning should give much more explicit and detailed attention to M & E activities.

求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Editorial Board Editorial Editorial Board Guest editorial Editorial
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1