当制度环境阻碍公私伙伴关系时:政治因素在ppp失败中的作用

Mhamed Biygautane, Omar Ahermouch
{"title":"当制度环境阻碍公私伙伴关系时:政治因素在ppp失败中的作用","authors":"Mhamed Biygautane, Omar Ahermouch","doi":"10.24294/jipd.v7i1.1937","DOIUrl":null,"url":null,"abstract":"The PPP scholarly work has effectively explored the material values attached to PPPs such as efficiency of services, value for money and productivity, but little attention has been paid to procedural public values. This paper aims to address this gap by exploring how Enfidha Airport in Tunisia failed to achieve both financial and procedural values that were expected from delivering the airport via the PPP route, and what coping strategies the public and private sectors deployed to ameliorate any resultant value conflicts. Based on the analysis of Enfidha Airport, it is argued that PPP projects are likely to fail to deliver financial and procedural values when the broader institutional context is not supportive of PPP arrangements, and when political and security risks are not adequately counted for during the bidding process.","PeriodicalId":41907,"journal":{"name":"Journal of Infrastructure Policy and Development","volume":null,"pages":null},"PeriodicalIF":1.0000,"publicationDate":"2023-06-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"When the institutional context thwarts public-private partnerships: The role of political factors in the failure of PPPs\",\"authors\":\"Mhamed Biygautane, Omar Ahermouch\",\"doi\":\"10.24294/jipd.v7i1.1937\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The PPP scholarly work has effectively explored the material values attached to PPPs such as efficiency of services, value for money and productivity, but little attention has been paid to procedural public values. This paper aims to address this gap by exploring how Enfidha Airport in Tunisia failed to achieve both financial and procedural values that were expected from delivering the airport via the PPP route, and what coping strategies the public and private sectors deployed to ameliorate any resultant value conflicts. Based on the analysis of Enfidha Airport, it is argued that PPP projects are likely to fail to deliver financial and procedural values when the broader institutional context is not supportive of PPP arrangements, and when political and security risks are not adequately counted for during the bidding process.\",\"PeriodicalId\":41907,\"journal\":{\"name\":\"Journal of Infrastructure Policy and Development\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":1.0000,\"publicationDate\":\"2023-06-20\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Infrastructure Policy and Development\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.24294/jipd.v7i1.1937\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"MANAGEMENT\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Infrastructure Policy and Development","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24294/jipd.v7i1.1937","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"MANAGEMENT","Score":null,"Total":0}
引用次数: 0

摘要

PPP学术研究已经有效地探索了PPP附带的物质价值,如服务效率、物有所值和生产力,但很少关注程序公共价值。本文旨在通过探讨突尼斯Enfidha机场如何未能实现通过PPP路线交付机场的预期财务和程序价值,以及公共和私营部门部署了哪些应对策略来改善任何由此产生的价值冲突,从而解决这一差距。基于对Enfidha机场的分析,本文认为,如果更广泛的制度背景不支持PPP安排,并且在招标过程中没有充分考虑政治和安全风险,PPP项目可能无法提供财务和程序价值。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
When the institutional context thwarts public-private partnerships: The role of political factors in the failure of PPPs
The PPP scholarly work has effectively explored the material values attached to PPPs such as efficiency of services, value for money and productivity, but little attention has been paid to procedural public values. This paper aims to address this gap by exploring how Enfidha Airport in Tunisia failed to achieve both financial and procedural values that were expected from delivering the airport via the PPP route, and what coping strategies the public and private sectors deployed to ameliorate any resultant value conflicts. Based on the analysis of Enfidha Airport, it is argued that PPP projects are likely to fail to deliver financial and procedural values when the broader institutional context is not supportive of PPP arrangements, and when political and security risks are not adequately counted for during the bidding process.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
1.00
自引率
14.30%
发文量
13
期刊最新文献
Forecasting China-Africa economic integration using Wavelet-ARIMA hybrid approach How are companies involved in the construction of the trans Sumatra toll road, in Indonesia? Role analysis and development policy Impact of big data analytics in project success: Mediating role of intellectual capital and knowledge sharing Development strategies for reducing infant mortality: A focus on healthcare infrastructure and policy in emerging Asian countries Organisational culture as a prerequisite for human resource management in public administration and its change in the time of COVID-19
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1