{"title":"开发伯彻伯德高纯锰项目","authors":"Justin Brown","doi":"10.1080/22020586.2019.12073238","DOIUrl":null,"url":null,"abstract":"Summary Element 25 Limited is developing the Butcherbird High Purity Manganese Project located approximately 130km south of Newman in the Pilbara region of Western Australia. The project hosts Australia’s largest onshore manganese deposit containing 263 Mt grading 10% manganese. The ore occurs as multiple supergene deposits which are the product of weathering of a regionally extensive basal shallow marine manganiferous shale. The resource was defined with a combination of airborne TEM, mapping and drilling. Significant exploration upside remains to expand the known resources. Element 25 is undertaking a Pre-Feasibility on the development of the Butcherbird Project using a hydrometallurgical flowsheet to produce high purity manganese metal and battery grade manganese sulphate. The production of manganese metal using electrowinning requires significant electricity. The project will likely use a combination of gas generation from the goldfields gas pipeline which crosses the project and renewable energy generation using wind and solar. The project will be an Australian first in terms of downstream processing of manganese metal and sulphate.","PeriodicalId":8502,"journal":{"name":"ASEG Extended Abstracts","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2019-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Developing the Butcherbird high purity manganese project\",\"authors\":\"Justin Brown\",\"doi\":\"10.1080/22020586.2019.12073238\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Summary Element 25 Limited is developing the Butcherbird High Purity Manganese Project located approximately 130km south of Newman in the Pilbara region of Western Australia. The project hosts Australia’s largest onshore manganese deposit containing 263 Mt grading 10% manganese. The ore occurs as multiple supergene deposits which are the product of weathering of a regionally extensive basal shallow marine manganiferous shale. The resource was defined with a combination of airborne TEM, mapping and drilling. Significant exploration upside remains to expand the known resources. Element 25 is undertaking a Pre-Feasibility on the development of the Butcherbird Project using a hydrometallurgical flowsheet to produce high purity manganese metal and battery grade manganese sulphate. The production of manganese metal using electrowinning requires significant electricity. The project will likely use a combination of gas generation from the goldfields gas pipeline which crosses the project and renewable energy generation using wind and solar. The project will be an Australian first in terms of downstream processing of manganese metal and sulphate.\",\"PeriodicalId\":8502,\"journal\":{\"name\":\"ASEG Extended Abstracts\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"ASEG Extended Abstracts\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1080/22020586.2019.12073238\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"ASEG Extended Abstracts","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1080/22020586.2019.12073238","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

Element 25 Limited正在开发位于西澳大利亚皮尔巴拉地区纽曼以南约130公里处的Butcherbird高纯度锰项目。该项目拥有澳大利亚最大的陆上锰矿,含锰2.63亿吨,锰品位为10%。该矿床为多个表生矿床,是区域性广泛的基底浅海含锰页岩风化作用的产物。该资源是通过机载瞬变电磁法、测绘和钻井相结合来确定的。已知资源的扩展仍有很大的勘探空间。Element 25正在对bucherbird项目的开发进行预可行性研究,使用湿法冶金流程生产高纯度金属锰和电池级硫酸锰。电积法生产金属锰需要大量的电力。该项目可能会使用穿越该项目的金矿天然气管道产生的天然气,以及利用风能和太阳能的可再生能源发电。该项目将是澳大利亚首个锰金属和硫酸盐下游加工项目。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Developing the Butcherbird high purity manganese project
Summary Element 25 Limited is developing the Butcherbird High Purity Manganese Project located approximately 130km south of Newman in the Pilbara region of Western Australia. The project hosts Australia’s largest onshore manganese deposit containing 263 Mt grading 10% manganese. The ore occurs as multiple supergene deposits which are the product of weathering of a regionally extensive basal shallow marine manganiferous shale. The resource was defined with a combination of airborne TEM, mapping and drilling. Significant exploration upside remains to expand the known resources. Element 25 is undertaking a Pre-Feasibility on the development of the Butcherbird Project using a hydrometallurgical flowsheet to produce high purity manganese metal and battery grade manganese sulphate. The production of manganese metal using electrowinning requires significant electricity. The project will likely use a combination of gas generation from the goldfields gas pipeline which crosses the project and renewable energy generation using wind and solar. The project will be an Australian first in terms of downstream processing of manganese metal and sulphate.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
The Forrestania and Nepean electromagnetic test ranges, Western Australia – a comparison of airborne systems Smart stitching: adding lateral priors to ensemble inversions as a post-processing step X-ray computerised tomography for fracture and facies characterisation and slab orientation in cores stored within aluminium tubes Geophysical characterization of the remanent anomaly in the Paleo/Mesoproteozoic Araí Intracontinental Rift, Brazil Viability of long-short term memory neural networks for seismic refraction first break detection – a preliminary study
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1