尼泊尔建筑公司的风险管理

Umesh Sukamani
{"title":"尼泊尔建筑公司的风险管理","authors":"Umesh Sukamani","doi":"10.3126/jsce.v9i9.46303","DOIUrl":null,"url":null,"abstract":"The main purpose of this study is to identify and focus on major factors that affect risk management in construction sites in developing countries like Nepal. Relative Importance Index (RII) analysis is carried out to rank major factors that affect risk management. Besides, ANOVA analysis is carried out to test the hypothesis. Findings show that there is no difference between small and large-scale project groups in their perception of the significance level of factors affecting Project Risk Management. Moreover, “a) payment delay b) project funding problem, and c) defective design” were top three major factors that affect risk management in developing countries like Nepal. The managerial level of construction firms mainly in developing countries, should focus on the top ten critical factors for better improvement of risk management no matter its size- be it is small- or large scale construction firms.","PeriodicalId":36368,"journal":{"name":"AIUB Journal of Science and Engineering","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2021-12-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Risk Management in Construction Firms in Nepal\",\"authors\":\"Umesh Sukamani\",\"doi\":\"10.3126/jsce.v9i9.46303\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The main purpose of this study is to identify and focus on major factors that affect risk management in construction sites in developing countries like Nepal. Relative Importance Index (RII) analysis is carried out to rank major factors that affect risk management. Besides, ANOVA analysis is carried out to test the hypothesis. Findings show that there is no difference between small and large-scale project groups in their perception of the significance level of factors affecting Project Risk Management. Moreover, “a) payment delay b) project funding problem, and c) defective design” were top three major factors that affect risk management in developing countries like Nepal. The managerial level of construction firms mainly in developing countries, should focus on the top ten critical factors for better improvement of risk management no matter its size- be it is small- or large scale construction firms.\",\"PeriodicalId\":36368,\"journal\":{\"name\":\"AIUB Journal of Science and Engineering\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-12-31\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"AIUB Journal of Science and Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.3126/jsce.v9i9.46303\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"Mathematics\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"AIUB Journal of Science and Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.3126/jsce.v9i9.46303","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"Mathematics","Score":null,"Total":0}
引用次数: 0

摘要

本研究的主要目的是确定并关注影响尼泊尔等发展中国家建筑工地风险管理的主要因素。采用相对重要性指数(Relative Importance Index, RII)分析对影响风险管理的主要因素进行排序。并进行方差分析对假设进行检验。研究结果表明,小型和大型项目组对影响项目风险管理的因素的显著性水平的感知没有差异。此外,“a)付款延迟、b)项目资金问题、c)设计缺陷”是影响尼泊尔等发展中国家风险管理的三大主要因素。主要在发展中国家的建筑公司的管理水平,无论其规模- -无论是小型还是大型建筑公司- -都应集中注意改善风险管理的十大关键因素。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Risk Management in Construction Firms in Nepal
The main purpose of this study is to identify and focus on major factors that affect risk management in construction sites in developing countries like Nepal. Relative Importance Index (RII) analysis is carried out to rank major factors that affect risk management. Besides, ANOVA analysis is carried out to test the hypothesis. Findings show that there is no difference between small and large-scale project groups in their perception of the significance level of factors affecting Project Risk Management. Moreover, “a) payment delay b) project funding problem, and c) defective design” were top three major factors that affect risk management in developing countries like Nepal. The managerial level of construction firms mainly in developing countries, should focus on the top ten critical factors for better improvement of risk management no matter its size- be it is small- or large scale construction firms.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
AIUB Journal of Science and Engineering
AIUB Journal of Science and Engineering Mathematics-Mathematics (miscellaneous)
CiteScore
1.00
自引率
0.00%
发文量
3
期刊最新文献
STUDI KARAKTERISTIK ASPAL BUTON DAERAH KABUNGKA KECAMATAN PASARWAJO KABUPATEN BUTON, SULAWESI TENGGARA DITRIBUSI PERGERAKAN PENUMPANG MENGGUNAKAN KAPAL FEERY DENGAN METODE DETROIT DI PROVINSI MALUKU UTARA STUDI INTERPRETASI LAPISAN BAWAH PERMUKAAN TANAH DENGAN METODE GEOLISTRIK DI JALAN LINTAS SUBAIM-BULI KECAMATAN WASILE TIMUR KABUPATEN HALMAHERA TIMUR convoHER2: A Deep Neural Network for Multi-Stage Classification of HER2 Breast Cancer ANALISIS SISTEM PENYARINGAN AIR BERSIH PADA AIR SUMUR WARGA DI KELURAHAN FITU KOTA TERNATE SELATAN
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1