超高层建筑施工液压自动爬模设备的计算与分析

Juwei Xia, Yun-long Yao, Xiao-shun Wu, Yuan-hong Chen
{"title":"超高层建筑施工液压自动爬模设备的计算与分析","authors":"Juwei Xia, Yun-long Yao, Xiao-shun Wu, Yuan-hong Chen","doi":"10.20898/J.IASS.2021.003","DOIUrl":null,"url":null,"abstract":"Hydraulic automatic climbing formwork equipment is widely used in super-high-rise building construction due to its advantages of simple operation, fast construction speed, low cost, and high automation. Quantitative calculation of the mechanical state of climbing formwork equipment\n is an important technical means of ensuring safety during super-high building construction. This work thus introduces a hydraulic climbing formwork equipment structure and subsequently analyzes the construction process and the main working state of the hydraulic climbing formwork equipment.\n Then, for the design of the outer climbing frame of the hydraulic climbing formwork, an approximate analytical method for solving the node reaction force is proposed. Finally, combined with the actual engineering, the calculation results of the approximate analytical method and the finite\n element method are compared, and the calculation and analysis methods of the hydraulic climbing formwork equipment frame and key nodes are introduced. The calculation analysis process and related conclusions can be used as engineering reference for similar projects.","PeriodicalId":42855,"journal":{"name":"Journal of the International Association for Shell and Spatial Structures","volume":null,"pages":null},"PeriodicalIF":1.1000,"publicationDate":"2021-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Calculation and Analysis of Hydraulic Automatic Climbing Formwork Equipment for Super-high Building Construction\",\"authors\":\"Juwei Xia, Yun-long Yao, Xiao-shun Wu, Yuan-hong Chen\",\"doi\":\"10.20898/J.IASS.2021.003\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Hydraulic automatic climbing formwork equipment is widely used in super-high-rise building construction due to its advantages of simple operation, fast construction speed, low cost, and high automation. Quantitative calculation of the mechanical state of climbing formwork equipment\\n is an important technical means of ensuring safety during super-high building construction. This work thus introduces a hydraulic climbing formwork equipment structure and subsequently analyzes the construction process and the main working state of the hydraulic climbing formwork equipment.\\n Then, for the design of the outer climbing frame of the hydraulic climbing formwork, an approximate analytical method for solving the node reaction force is proposed. Finally, combined with the actual engineering, the calculation results of the approximate analytical method and the finite\\n element method are compared, and the calculation and analysis methods of the hydraulic climbing formwork equipment frame and key nodes are introduced. The calculation analysis process and related conclusions can be used as engineering reference for similar projects.\",\"PeriodicalId\":42855,\"journal\":{\"name\":\"Journal of the International Association for Shell and Spatial Structures\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":1.1000,\"publicationDate\":\"2021-03-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of the International Association for Shell and Spatial Structures\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.20898/J.IASS.2021.003\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"ENGINEERING, CIVIL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of the International Association for Shell and Spatial Structures","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.20898/J.IASS.2021.003","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, CIVIL","Score":null,"Total":0}
引用次数: 3

摘要

液压自动爬模设备由于其操作简单、施工速度快、成本低、自动化程度高等优点,在超高层建筑施工中得到了广泛的应用。对攀爬模板设备的力学状态进行定量计算是保证超高层建筑施工安全的重要技术手段。介绍了一种液压爬模设备的结构,分析了液压爬模设备的施工过程和主要工作状态。然后,针对液压爬坡模板外爬坡框架的设计,提出了求解节点反力的近似解析方法。最后,结合工程实际,比较了近似解析法和有限元法的计算结果,介绍了液压爬模设备框架和关键节点的计算分析方法。计算分析过程及相关结论可供类似工程参考。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Calculation and Analysis of Hydraulic Automatic Climbing Formwork Equipment for Super-high Building Construction
Hydraulic automatic climbing formwork equipment is widely used in super-high-rise building construction due to its advantages of simple operation, fast construction speed, low cost, and high automation. Quantitative calculation of the mechanical state of climbing formwork equipment is an important technical means of ensuring safety during super-high building construction. This work thus introduces a hydraulic climbing formwork equipment structure and subsequently analyzes the construction process and the main working state of the hydraulic climbing formwork equipment. Then, for the design of the outer climbing frame of the hydraulic climbing formwork, an approximate analytical method for solving the node reaction force is proposed. Finally, combined with the actual engineering, the calculation results of the approximate analytical method and the finite element method are compared, and the calculation and analysis methods of the hydraulic climbing formwork equipment frame and key nodes are introduced. The calculation analysis process and related conclusions can be used as engineering reference for similar projects.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
1.40
自引率
0.00%
发文量
17
期刊介绍: The Association publishes an international journal, the Journal of the IASS, four times yearly, in print (ISSN 1028-365X) and on-line (ISSN 1996-9015). The months of publication are March, June, September and December. Occasional extra electronic-only issues are included in the on-line version. From this page you can access one or more issues -- a sample issue if you are not logged into the members-only portion of the site, or the current issue and several back issues if you are logged in as a member. For any issue that you can view, you can download articles as .pdf files.
期刊最新文献
Membrane Solution for a Paraboloid under Self-Weight An Initial-Morphogenesis Technique of Free-Form Shell Roofing Based on a Fourier Transform Seismic Design of Sports Arena for Tokyo Olympic 2020 Using Energy-Dissipation Devices Progressive Collapse Analysis of Single-Layer Latticed Domes With Fabricated Joints The Gridshells for the San Francisco Salesforce Transit Center
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1