交货期方差的近似:预测和库存评估

IF 0.1 4区 工程技术 Q4 ENGINEERING, MANUFACTURING Manufacturing Engineering Pub Date : 2021-04-08 DOI:10.2139/ssrn.3822270
Patrick Saoud, N. Kourentzes, J. Boylan
{"title":"交货期方差的近似:预测和库存评估","authors":"Patrick Saoud, N. Kourentzes, J. Boylan","doi":"10.2139/ssrn.3822270","DOIUrl":null,"url":null,"abstract":"Safety stock is necessary for firms in order to manage the uncertainty of demand. A key component in its determination is the estimation of the variance of the forecast error over lead time. Given the multitude of demand processes that lack analytical expressions of the variance of forecast error, an approximation is needed. It is common to resort to finding the one-step ahead forecast errors variance and scaling it by the lead time. However, this approximation is flawed for many processes as it overlooks the autocorrelations that arise between forecasts made at different lead times. This research addresses the issue of these correlations first by demonstrating their existence for some fundamental demand processes, and second by showing through an inventory simulation the inadequacy of the approximation. We propose to monitor the empirical variance of the lead time errors, instead of estimating the point forecast error variance and extending it over the lead time interval. The simulation findings indicate that this approach provides superior results to other approximations in terms of cycle-service level. Given its lack of assumptions and computational simplicity, it can be easily implemented in any software, making it appealing to both practitioners and academics.","PeriodicalId":49886,"journal":{"name":"Manufacturing Engineering","volume":"46 1","pages":""},"PeriodicalIF":0.1000,"publicationDate":"2021-04-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"Approximations for the Lead Time Variance: A Forecasting and Inventory Evaluation\",\"authors\":\"Patrick Saoud, N. Kourentzes, J. Boylan\",\"doi\":\"10.2139/ssrn.3822270\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Safety stock is necessary for firms in order to manage the uncertainty of demand. A key component in its determination is the estimation of the variance of the forecast error over lead time. Given the multitude of demand processes that lack analytical expressions of the variance of forecast error, an approximation is needed. It is common to resort to finding the one-step ahead forecast errors variance and scaling it by the lead time. However, this approximation is flawed for many processes as it overlooks the autocorrelations that arise between forecasts made at different lead times. This research addresses the issue of these correlations first by demonstrating their existence for some fundamental demand processes, and second by showing through an inventory simulation the inadequacy of the approximation. We propose to monitor the empirical variance of the lead time errors, instead of estimating the point forecast error variance and extending it over the lead time interval. The simulation findings indicate that this approach provides superior results to other approximations in terms of cycle-service level. Given its lack of assumptions and computational simplicity, it can be easily implemented in any software, making it appealing to both practitioners and academics.\",\"PeriodicalId\":49886,\"journal\":{\"name\":\"Manufacturing Engineering\",\"volume\":\"46 1\",\"pages\":\"\"},\"PeriodicalIF\":0.1000,\"publicationDate\":\"2021-04-08\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Manufacturing Engineering\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.2139/ssrn.3822270\",\"RegionNum\":4,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"ENGINEERING, MANUFACTURING\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Manufacturing Engineering","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.2139/ssrn.3822270","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, MANUFACTURING","Score":null,"Total":0}
引用次数: 4

摘要

为了管理需求的不确定性,安全库存是企业所必需的。在其确定的一个关键组成部分是预测误差的方差估计在提前期。由于许多需求过程缺乏预测误差方差的解析表达式,因此需要一个近似。通常的做法是找到提前一步的预测误差方差,并根据提前期对其进行缩放。然而,这种近似对于许多过程来说是有缺陷的,因为它忽略了在不同提前期做出的预测之间产生的自相关性。本研究首先通过证明它们在一些基本需求过程中的存在来解决这些相关性的问题,其次通过库存模拟显示近似的不充分。我们建议监测提前期误差的经验方差,而不是估计点预测误差方差并将其扩展到提前期区间。仿真结果表明,该方法在周期服务水平方面优于其他近似方法。由于缺乏假设和计算的简单性,它可以很容易地在任何软件中实现,这使得它对实践者和学者都很有吸引力。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Approximations for the Lead Time Variance: A Forecasting and Inventory Evaluation
Safety stock is necessary for firms in order to manage the uncertainty of demand. A key component in its determination is the estimation of the variance of the forecast error over lead time. Given the multitude of demand processes that lack analytical expressions of the variance of forecast error, an approximation is needed. It is common to resort to finding the one-step ahead forecast errors variance and scaling it by the lead time. However, this approximation is flawed for many processes as it overlooks the autocorrelations that arise between forecasts made at different lead times. This research addresses the issue of these correlations first by demonstrating their existence for some fundamental demand processes, and second by showing through an inventory simulation the inadequacy of the approximation. We propose to monitor the empirical variance of the lead time errors, instead of estimating the point forecast error variance and extending it over the lead time interval. The simulation findings indicate that this approach provides superior results to other approximations in terms of cycle-service level. Given its lack of assumptions and computational simplicity, it can be easily implemented in any software, making it appealing to both practitioners and academics.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Manufacturing Engineering
Manufacturing Engineering 工程技术-工程:制造
自引率
0.00%
发文量
0
审稿时长
6-12 weeks
期刊介绍: Information not localized
期刊最新文献
Capacity Co-Opetition in Service Clusters with Waiting-area Entertainment Cloud-Kitchens in High-Density Cities: Economies of Scale Through Co-Location Credit Chain and Sectoral Co-movement: A Multi-Region Investigation Approximations for the Lead Time Variance: A Forecasting and Inventory Evaluation Reselling or Agency Selling? Consumer Valuation, Quality Design, and Manufacturers' Competition
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1