{"title":"露天矿生产炮眼模型的建立及其应用","authors":"Zhang Xian","doi":"10.1201/9781003078661-42","DOIUrl":null,"url":null,"abstract":"The collection and management of the productive blasthole data and present topography data in an open pit are presented in this paper. The procedure of using Mintec software to establish blasthole model is also described. The application of the blasthole model in some aspects such as short term plan, ore control, modification of production plan and production control are summarized. Finally, some author's views are given.","PeriodicalId":18580,"journal":{"name":"矿冶","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2001-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Establishment of productive blasthole model and Its application in open pit\",\"authors\":\"Zhang Xian\",\"doi\":\"10.1201/9781003078661-42\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The collection and management of the productive blasthole data and present topography data in an open pit are presented in this paper. The procedure of using Mintec software to establish blasthole model is also described. The application of the blasthole model in some aspects such as short term plan, ore control, modification of production plan and production control are summarized. Finally, some author's views are given.\",\"PeriodicalId\":18580,\"journal\":{\"name\":\"矿冶\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2001-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"矿冶\",\"FirstCategoryId\":\"1087\",\"ListUrlMain\":\"https://doi.org/10.1201/9781003078661-42\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"矿冶","FirstCategoryId":"1087","ListUrlMain":"https://doi.org/10.1201/9781003078661-42","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Establishment of productive blasthole model and Its application in open pit
The collection and management of the productive blasthole data and present topography data in an open pit are presented in this paper. The procedure of using Mintec software to establish blasthole model is also described. The application of the blasthole model in some aspects such as short term plan, ore control, modification of production plan and production control are summarized. Finally, some author's views are given.