关于井筒准备紧固问题

F. Akhundov, M. Sarbopeeva, R. Bayamirova, A. Togasheva, A. Zholbasarova
{"title":"关于井筒准备紧固问题","authors":"F. Akhundov, M. Sarbopeeva, R. Bayamirova, A. Togasheva, A. Zholbasarova","doi":"10.32014/2023.2518-170x.296","DOIUrl":null,"url":null,"abstract":". The proposed article analyzes the issue related to the preparation of the wellbore for cementing the drilled interval of the well. It has been revealed that poor-quality cleaning of the well bore, including the existing cavities from drilling, brings great problems to the drilling process. For example, in conditions of insufficiently effective removal of cuttings to the surface due to the presence of a gradient layer in the flow of flushing fluid and stagnant zones in the caverns, accumulation of drill cuttings occurs. In the process of well placement, due to changing hydrodynamic conditions (pressure and flow fluctuations) when performing technological operations (flushing, development, drilling, tripping, etc.) and at certain volumes of the accumulated sludge volume in the cavity, it slips into the wellbore wells. As a result of the drilling tool sticking in many wells, sticking of the string with loss of a certain part of the wellbore takes place. The analysis carried out using buffer liquids known and widely used in the process of well fixing allowed us to reveal that these compositions, along with the","PeriodicalId":45691,"journal":{"name":"News of the National Academy of Sciences of the Republic of Kazakhstan-Series of Geology and Technical Sciences","volume":"78 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-06-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"ON THE ISSUE OF PREPARING THE WELLBORE FOR ITS FASTENING\",\"authors\":\"F. Akhundov, M. Sarbopeeva, R. Bayamirova, A. Togasheva, A. Zholbasarova\",\"doi\":\"10.32014/2023.2518-170x.296\",\"DOIUrl\":null,\"url\":null,\"abstract\":\". The proposed article analyzes the issue related to the preparation of the wellbore for cementing the drilled interval of the well. It has been revealed that poor-quality cleaning of the well bore, including the existing cavities from drilling, brings great problems to the drilling process. For example, in conditions of insufficiently effective removal of cuttings to the surface due to the presence of a gradient layer in the flow of flushing fluid and stagnant zones in the caverns, accumulation of drill cuttings occurs. In the process of well placement, due to changing hydrodynamic conditions (pressure and flow fluctuations) when performing technological operations (flushing, development, drilling, tripping, etc.) and at certain volumes of the accumulated sludge volume in the cavity, it slips into the wellbore wells. As a result of the drilling tool sticking in many wells, sticking of the string with loss of a certain part of the wellbore takes place. The analysis carried out using buffer liquids known and widely used in the process of well fixing allowed us to reveal that these compositions, along with the\",\"PeriodicalId\":45691,\"journal\":{\"name\":\"News of the National Academy of Sciences of the Republic of Kazakhstan-Series of Geology and Technical Sciences\",\"volume\":\"78 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-06-14\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"News of the National Academy of Sciences of the Republic of Kazakhstan-Series of Geology and Technical Sciences\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.32014/2023.2518-170x.296\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"Earth and Planetary Sciences\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"News of the National Academy of Sciences of the Republic of Kazakhstan-Series of Geology and Technical Sciences","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.32014/2023.2518-170x.296","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"Earth and Planetary Sciences","Score":null,"Total":0}
引用次数: 0

摘要

. 本文分析了该井井段固井准备的相关问题。人们发现,井眼(包括钻井留下的空腔)的清洁质量差,给钻井过程带来了很大的问题。例如,由于冲刷流体流动中存在梯度层和岩洞中的停滞带,岩屑无法有效清除到地面,就会发生钻屑堆积。在排井过程中,由于进行工艺操作(冲洗、开发、钻井、起下钻等)过程中流体动力条件(压力、流量波动)的变化,在空腔内累积污泥体积达到一定体积时,会滑入井筒井中。由于钻井工具卡在许多井中,导致管柱卡在井眼的某一部分漏失。使用已知的缓冲液进行分析,并在固井过程中广泛使用,使我们能够揭示这些成分,以及
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
ON THE ISSUE OF PREPARING THE WELLBORE FOR ITS FASTENING
. The proposed article analyzes the issue related to the preparation of the wellbore for cementing the drilled interval of the well. It has been revealed that poor-quality cleaning of the well bore, including the existing cavities from drilling, brings great problems to the drilling process. For example, in conditions of insufficiently effective removal of cuttings to the surface due to the presence of a gradient layer in the flow of flushing fluid and stagnant zones in the caverns, accumulation of drill cuttings occurs. In the process of well placement, due to changing hydrodynamic conditions (pressure and flow fluctuations) when performing technological operations (flushing, development, drilling, tripping, etc.) and at certain volumes of the accumulated sludge volume in the cavity, it slips into the wellbore wells. As a result of the drilling tool sticking in many wells, sticking of the string with loss of a certain part of the wellbore takes place. The analysis carried out using buffer liquids known and widely used in the process of well fixing allowed us to reveal that these compositions, along with the
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
1.80
自引率
0.00%
发文量
83
期刊最新文献
ENERGY EFFICIENCY AND ENVIRONMENTAL FRIENDLINESS OF FUNCTIONING OF GEOTECHNOLOGICAL COMPLEXES AT QUARRIES: DIRECTIONS AND WAYS OF MANAGEMENT RESEARCH AND DEVELOPMENT OF CEMENTS WITH DIFFERENTIAL PROPERTIES FOR COMPLETING GAS WELLS SCIENTIFIC RATIONALE FOR ASSESSMENT OF INVESTMENT POTENTIAL OF RUDNY ALTAI POLYMETALLIC DEPOSITS STUDY OF THE EFFECT OF DRILLING FLUIDS ON SAMPLES OF SALT-BEARING ROCKS STUDY OF THE VEGETATION COVER OF ECOSYSTEMS OF THE CHINGIRLAU DISTRICT OF THE WEST KAZAKHSTAN REGION BASED ON THE USE OF GIS TECHNOLOGIES
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1