{"title":"通过改进技术预测来缩短交货时间:对技术可用性进行更有效的预测的一些具体建议","authors":"David Novick , Frederick S. Pardee (Head)","doi":"10.1016/0099-3964(69)90015-5","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":101211,"journal":{"name":"Technological Forecasting","volume":"1 2","pages":"Pages 141-150"},"PeriodicalIF":0.0000,"publicationDate":"1969-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/0099-3964(69)90015-5","citationCount":"3","resultStr":"{\"title\":\"Reducing lead-time through improved technological forecasting: Some specific suggestions for more usefully formulated projections of technological availability\",\"authors\":\"David Novick , Frederick S. Pardee (Head)\",\"doi\":\"10.1016/0099-3964(69)90015-5\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\",\"PeriodicalId\":101211,\"journal\":{\"name\":\"Technological Forecasting\",\"volume\":\"1 2\",\"pages\":\"Pages 141-150\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1969-09-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://sci-hub-pdf.com/10.1016/0099-3964(69)90015-5\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Technological Forecasting\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://www.sciencedirect.com/science/article/pii/0099396469900155\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Technological Forecasting","FirstCategoryId":"1085","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/0099396469900155","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Reducing lead-time through improved technological forecasting: Some specific suggestions for more usefully formulated projections of technological availability