生命周期缺口对城市基础设施工程生命周期成本的影响研究

Weiyi He, Yilin Yin
{"title":"生命周期缺口对城市基础设施工程生命周期成本的影响研究","authors":"Weiyi He, Yilin Yin","doi":"10.1109/ICIEEM.2009.5344489","DOIUrl":null,"url":null,"abstract":"Life Cycle Cost optimization has become a new focus of urban infrastructure engineering economic study. This paper shows the replacement reasons and preferences related to the different type of life cycle by studying literatures. It is clear by analyzing a basic LCC model that sensitivity of the LCC functions on life cycle gaps is less than the discount rate when life period is longer, so the life cycle seems to be a secondary factor for LCC optimization. But some special replacement projects have been found by an empirical study on some subway engineering assets. The results have demonstrated that the deviation between predicted and actual life greatly affected the LCC of subway engineering, and these gaps mainly contributed the recurring investment to the LCC. A new concept of built environment life cycle is put forward.","PeriodicalId":6326,"journal":{"name":"2009 16th International Conference on Industrial Engineering and Engineering Management","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2009-12-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Research on the effect of life cycle gaps on life cycle cost of urban infrastructure engineering\",\"authors\":\"Weiyi He, Yilin Yin\",\"doi\":\"10.1109/ICIEEM.2009.5344489\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Life Cycle Cost optimization has become a new focus of urban infrastructure engineering economic study. This paper shows the replacement reasons and preferences related to the different type of life cycle by studying literatures. It is clear by analyzing a basic LCC model that sensitivity of the LCC functions on life cycle gaps is less than the discount rate when life period is longer, so the life cycle seems to be a secondary factor for LCC optimization. But some special replacement projects have been found by an empirical study on some subway engineering assets. The results have demonstrated that the deviation between predicted and actual life greatly affected the LCC of subway engineering, and these gaps mainly contributed the recurring investment to the LCC. A new concept of built environment life cycle is put forward.\",\"PeriodicalId\":6326,\"journal\":{\"name\":\"2009 16th International Conference on Industrial Engineering and Engineering Management\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2009-12-04\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2009 16th International Conference on Industrial Engineering and Engineering Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICIEEM.2009.5344489\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2009 16th International Conference on Industrial Engineering and Engineering Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICIEEM.2009.5344489","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

生命周期成本优化已成为城市基础设施工程经济研究的新热点。通过文献研究,揭示了不同生命周期类型的替代原因和偏好。通过对一个基本LCC模型的分析可知,当生命周期较长时,LCC函数对生命周期缺口的敏感性小于折现率,因此生命周期似乎是LCC优化的次要因素。但通过对部分地铁工程资产的实证研究,发现了一些特殊的置换项目。结果表明,预测寿命与实际寿命的偏差对地铁工程的寿命成本产生了较大的影响,而这些差距主要是造成寿命成本成本重复投资的原因。提出了建筑环境生命周期的新概念。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Research on the effect of life cycle gaps on life cycle cost of urban infrastructure engineering
Life Cycle Cost optimization has become a new focus of urban infrastructure engineering economic study. This paper shows the replacement reasons and preferences related to the different type of life cycle by studying literatures. It is clear by analyzing a basic LCC model that sensitivity of the LCC functions on life cycle gaps is less than the discount rate when life period is longer, so the life cycle seems to be a secondary factor for LCC optimization. But some special replacement projects have been found by an empirical study on some subway engineering assets. The results have demonstrated that the deviation between predicted and actual life greatly affected the LCC of subway engineering, and these gaps mainly contributed the recurring investment to the LCC. A new concept of built environment life cycle is put forward.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Binary search tree visualization algorithm Dynamic alliance partner selection and its negotiation strategy based on agent and resources Research on reverse logistics-oriented multisources inventory control model The syncretism of capital structure theory: An explanation from adjustment speed of capital structure Research on the security model for e-business process management
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1