京雄铁路桥BIM +精细化管控平台设计与应用

High-speed Railway Pub Date : 2023-09-01 Epub Date: 2023-07-07 DOI:10.1016/j.hspr.2023.07.001
Jinghan Zhang, Jiayu Li, Beisheng Liu, Hui Li, Wei Yang
{"title":"京雄铁路桥BIM +精细化管控平台设计与应用","authors":"Jinghan Zhang,&nbsp;Jiayu Li,&nbsp;Beisheng Liu,&nbsp;Hui Li,&nbsp;Wei Yang","doi":"10.1016/j.hspr.2023.07.001","DOIUrl":null,"url":null,"abstract":"<div><p>The high-speed railway construction involves multiple professional fields, such as railway design, construction, and supervision. This paper architects the \"BIM+ \" project refined management platform, designs the platform's logical architecture, physical architecture, and solves several key technology difficulties. This \"BIM+ \" platform has been applied on the Jingxiong Bridge Project and achieved all-round, whole-process and multi- management of high-speed railway engineering construction. It significantly improves the level of construction management, and plays a role in promoting the development of high-speed railway construction informatization.</p></div>","PeriodicalId":100607,"journal":{"name":"High-speed Railway","volume":"1 3","pages":"Pages 211-218"},"PeriodicalIF":0.0000,"publicationDate":"2023-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://www.sciencedirect.com/science/article/pii/S2949867823000211/pdfft?md5=6ed13801e1437070a131cc744f91b433&pid=1-s2.0-S2949867823000211-main.pdf","citationCount":"0","resultStr":"{\"title\":\"The design and application of BIM + refined management and control platform for the Jingxiong railway bridge\",\"authors\":\"Jinghan Zhang,&nbsp;Jiayu Li,&nbsp;Beisheng Liu,&nbsp;Hui Li,&nbsp;Wei Yang\",\"doi\":\"10.1016/j.hspr.2023.07.001\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<div><p>The high-speed railway construction involves multiple professional fields, such as railway design, construction, and supervision. This paper architects the \\\"BIM+ \\\" project refined management platform, designs the platform's logical architecture, physical architecture, and solves several key technology difficulties. This \\\"BIM+ \\\" platform has been applied on the Jingxiong Bridge Project and achieved all-round, whole-process and multi- management of high-speed railway engineering construction. It significantly improves the level of construction management, and plays a role in promoting the development of high-speed railway construction informatization.</p></div>\",\"PeriodicalId\":100607,\"journal\":{\"name\":\"High-speed Railway\",\"volume\":\"1 3\",\"pages\":\"Pages 211-218\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-09-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://www.sciencedirect.com/science/article/pii/S2949867823000211/pdfft?md5=6ed13801e1437070a131cc744f91b433&pid=1-s2.0-S2949867823000211-main.pdf\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"High-speed Railway\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://www.sciencedirect.com/science/article/pii/S2949867823000211\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"2023/7/7 0:00:00\",\"PubModel\":\"Epub\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"High-speed Railway","FirstCategoryId":"1085","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S2949867823000211","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"2023/7/7 0:00:00","PubModel":"Epub","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

高速铁路建设涉及铁路设计、施工、监理等多个专业领域。本文构建了“BIM+”项目精细化管理平台,设计了平台的逻辑架构、物理架构,解决了几个关键技术难点。该“BIM+”平台已应用于京雄大桥项目,实现了高铁工程建设的全方位、全过程、多面管理。显著提高了施工管理水平,对高速铁路建设信息化的发展起到了推动作用。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
The design and application of BIM + refined management and control platform for the Jingxiong railway bridge

The high-speed railway construction involves multiple professional fields, such as railway design, construction, and supervision. This paper architects the "BIM+ " project refined management platform, designs the platform's logical architecture, physical architecture, and solves several key technology difficulties. This "BIM+ " platform has been applied on the Jingxiong Bridge Project and achieved all-round, whole-process and multi- management of high-speed railway engineering construction. It significantly improves the level of construction management, and plays a role in promoting the development of high-speed railway construction informatization.

求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Estimated carrying capacity based on different signal types for Vietnam’s high-speed railway plan Research on intelligent management of air compression refrigeration system in the environmental wind tunnel of high-speed railway trains A knowledge modeling method for high-speed railway emergency faults based on structured logic diagrams and knowledge graphs Analysis of loading characteristics of windshield wiper structure on high-speed train A generation-based defect detection system for rail transit infrastructure
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1