数据中心灾难恢复响应中的故障安全点。

Q3 Medicine Journal of business continuity & emergency planning Pub Date : 2023-01-01
Russell Neal
{"title":"数据中心灾难恢复响应中的故障安全点。","authors":"Russell Neal","doi":"","DOIUrl":null,"url":null,"abstract":"<p><p>Certain social psychological variables can result in delays to essential steps in IT data centre disaster recovery response, including the formal declaration of disaster. These delays can result in failure to meet recovery time objectives, additional financial losses, regulatory issues and a significant loss of customer goodwill, all beyond what would have been incurred in the absence of delays. This paper describes a failsafe model to counter these variables. The model will help ensure that any disaster recovery response step earmarked as a failsafe point is completed in a timely manner, from the moment of disaster to the resumption of business.</p>","PeriodicalId":39080,"journal":{"name":"Journal of business continuity & emergency planning","volume":"16 3","pages":"229-247"},"PeriodicalIF":0.0000,"publicationDate":"2023-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Failsafe points in data centre disaster recovery response.\",\"authors\":\"Russell Neal\",\"doi\":\"\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<p><p>Certain social psychological variables can result in delays to essential steps in IT data centre disaster recovery response, including the formal declaration of disaster. These delays can result in failure to meet recovery time objectives, additional financial losses, regulatory issues and a significant loss of customer goodwill, all beyond what would have been incurred in the absence of delays. This paper describes a failsafe model to counter these variables. The model will help ensure that any disaster recovery response step earmarked as a failsafe point is completed in a timely manner, from the moment of disaster to the resumption of business.</p>\",\"PeriodicalId\":39080,\"journal\":{\"name\":\"Journal of business continuity & emergency planning\",\"volume\":\"16 3\",\"pages\":\"229-247\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of business continuity & emergency planning\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"Medicine\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of business continuity & emergency planning","FirstCategoryId":"1085","ListUrlMain":"","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"Medicine","Score":null,"Total":0}
引用次数: 0

摘要

某些社会心理变量可能导致IT数据中心灾难恢复响应中的关键步骤延迟,包括正式宣布灾难。这些延迟可能导致无法达到恢复时间目标、额外的财务损失、监管问题和客户信誉的重大损失,这些都超出了没有延迟所产生的后果。本文描述了一个故障安全模型来应对这些变量。该模型将有助于确保从灾难发生到业务恢复,任何指定为故障安全点的灾难恢复响应步骤都能及时完成。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Failsafe points in data centre disaster recovery response.

Certain social psychological variables can result in delays to essential steps in IT data centre disaster recovery response, including the formal declaration of disaster. These delays can result in failure to meet recovery time objectives, additional financial losses, regulatory issues and a significant loss of customer goodwill, all beyond what would have been incurred in the absence of delays. This paper describes a failsafe model to counter these variables. The model will help ensure that any disaster recovery response step earmarked as a failsafe point is completed in a timely manner, from the moment of disaster to the resumption of business.

求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
1.30
自引率
0.00%
发文量
34
期刊介绍: Journal of Business Continuity & Emergency Planning is the leading professional journal publishing peer-reviewed articles and case studies written by and for business continuity and emergency managers.
期刊最新文献
A song of water and fire: Key lessons from Hurricane Fiona and Nova Scotia wildfires. Editorial. Knowledge production as an enabler to effective organisational resilience. Manitoba's provincial diagnostic and surgical recovery task force: Structure, processes and outcomes. Rapid disposition, emergency department flow and best practices in hospital mass casualty incident response.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1