Title 10, Section 2366a Certification Requirements and Early Cost Estimating in the Army

Stephen Bagby
{"title":"Title 10, Section 2366a Certification Requirements and Early Cost Estimating in the Army","authors":"Stephen Bagby","doi":"10.1080/1941658X.2009.10462220","DOIUrl":null,"url":null,"abstract":"For the past few years Department of Defense (DoD) budget reductions have been looming just at the edge of the horizon, and now those budget limitations are upon us. The cost parameter will now play a greater role in the decision-making process than it did in the past. Leaders will rely on quality cost estimates to aid their decisions as competition for limited resources increases. The Army will have to provide cost estimates earlier in the lifecycle process and show proof that programs are funded in accordance with the estimates.","PeriodicalId":390877,"journal":{"name":"Journal of Cost Analysis and Parametrics","volume":"35 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2009-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Cost Analysis and Parametrics","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1080/1941658X.2009.10462220","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

For the past few years Department of Defense (DoD) budget reductions have been looming just at the edge of the horizon, and now those budget limitations are upon us. The cost parameter will now play a greater role in the decision-making process than it did in the past. Leaders will rely on quality cost estimates to aid their decisions as competition for limited resources increases. The Army will have to provide cost estimates earlier in the lifecycle process and show proof that programs are funded in accordance with the estimates.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
标题10,第2366a节认证要求和陆军早期成本估算
在过去的几年里,国防部(DoD)的预算削减已经隐约出现在地平线的边缘,现在这些预算限制已经摆在我们面前。与过去相比,成本参数现在将在决策过程中发挥更大的作用。随着对有限资源的竞争加剧,领导者将依靠质量成本估算来帮助他们做出决策。陆军将必须在生命周期过程的早期提供成本估算,并证明项目是根据估算提供资金的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Editorial Board EOV Multiproduct Cost-Volume-Profit Model: A Resource Reallocation Approach for Decision Making Dynamics of New Building Construction Costs: Implications for Forecasting Escalation Allowances Balancing Expert Opinion and Historical Data: The Case of Baseball Umpires Using Robust Statistical Methodology to Evaluate the Cost Performance of Project Delivery Systems: A Case Study of Horizontal Construction
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1