Integrated Method for Designing Valuable Flexibility In Oil Development Projects

A. Babajide, R. Neufville, M. Cardin
{"title":"Integrated Method for Designing Valuable Flexibility In Oil Development Projects","authors":"A. Babajide, R. Neufville, M. Cardin","doi":"10.2118/122710-PA","DOIUrl":null,"url":null,"abstract":"Summary This paper presents an integrated method for identifying and inserting valuable flexibility into major development projects. It builds upon and ties together recent work that (1) documents how errors in estimates can bias the selection of design concepts, (2) shows how concept flexibility can improve the performance of projects, and (3) presents useful ways to present the probability distribution of outcomes. The proposed approach is an outcome of long-term work on the improvement of design methods. It involves four complementary steps: (1) the development and economic evaluation of a base case standard design, (2) the exploration of the range of outcomes this design might generate, so that it is possible to proceed to (3) the identification of opportunities for flexible design, and then (4) the evaluation and selection of the most valuable kinds of flexibility to incorporate into the design concepts. This approach embodies a paradigmatic change in the way designers deal with uncertainty: instead of designing based on fixed assumptions and then testing the sensitivity of the design to risks; the proposed process recognizes risks in the design process, and thereby develops valuable flexibility that increases the expected value of projects. A case study of the development of an oil platform in the Gulf of Mexico demonstrates the proposed method.","PeriodicalId":335535,"journal":{"name":"Spe Projects Facilities & Construction","volume":"160 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2009-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"20","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Spe Projects Facilities & Construction","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/122710-PA","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 20

Abstract

Summary This paper presents an integrated method for identifying and inserting valuable flexibility into major development projects. It builds upon and ties together recent work that (1) documents how errors in estimates can bias the selection of design concepts, (2) shows how concept flexibility can improve the performance of projects, and (3) presents useful ways to present the probability distribution of outcomes. The proposed approach is an outcome of long-term work on the improvement of design methods. It involves four complementary steps: (1) the development and economic evaluation of a base case standard design, (2) the exploration of the range of outcomes this design might generate, so that it is possible to proceed to (3) the identification of opportunities for flexible design, and then (4) the evaluation and selection of the most valuable kinds of flexibility to incorporate into the design concepts. This approach embodies a paradigmatic change in the way designers deal with uncertainty: instead of designing based on fixed assumptions and then testing the sensitivity of the design to risks; the proposed process recognizes risks in the design process, and thereby develops valuable flexibility that increases the expected value of projects. A case study of the development of an oil platform in the Gulf of Mexico demonstrates the proposed method.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
石油开发项目价值柔性设计的集成方法
本文提出了一种识别并在大型开发项目中插入有价值的灵活性的综合方法。它建立并结合了最近的工作:(1)记录了估计中的错误如何影响设计概念的选择,(2)显示了概念灵活性如何改善项目的性能,以及(3)提出了表示结果概率分布的有用方法。所提出的方法是改进设计方法的长期工作的结果。它包括四个互补的步骤:(1)基本情况标准设计的开发和经济评估,(2)探索该设计可能产生的结果范围,以便有可能进行(3)确定灵活设计的机会,然后(4)评估和选择最有价值的灵活性类型以纳入设计概念。这种方法体现了设计师处理不确定性方式的典型变化:不再基于固定假设进行设计,然后测试设计对风险的敏感性;建议的过程识别设计过程中的风险,从而开发有价值的灵活性,从而增加项目的预期价值。一个案例研究的发展在墨西哥湾的一个石油平台演示了该方法。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Carbon Sequestration From Waste Through Conversion to Charcoal: Equipment for a Small-Scale Operation A New Proprietary Hybrid-Solvent Process for Improved Mercaptan Removal Development of Simple-To-Use Predictive Tool for Rapid Prediction of n-Alkanes Surface Tension Estimation of Potential Precipitation From an Equilibrated Calcium Carbonate Aqueous Phase Using Simple Predictive Tool Boosting Energy Efficiency Using Waste-Heat-Powered Absorption Chillers
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1