{"title":"Generating Proactive Execution Policies for Resource-Constrained Projects with Uncertain Activity Durations","authors":"Filip Deblaere, E. Demeulemeester, W. Herroelen","doi":"10.2139/ssrn.1588642","DOIUrl":null,"url":null,"abstract":"The resource-constrained project scheduling problem involves the determination of a schedule of the project activities, satisfying the precedence relations and resource constraints while minimizing the project duration. In practice, activity durations may be subject to variability, such that a stochastic approach to the problem is more appropriate. We propose a methodology for the determination of a project execution policy and a vector of predictive activity starting times with the objective of minimizing a cost function that consists of the weighted expected activity starting time deviations and the penalties or bonuses associated with late or early project completion. In a computational experiment, we show that our procedure greatly outperforms existing algorithms described in the literature","PeriodicalId":165362,"journal":{"name":"ERN: Discrete Regression & Qualitative Choice Models (Single) (Topic)","volume":"12 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-02-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"ERN: Discrete Regression & Qualitative Choice Models (Single) (Topic)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2139/ssrn.1588642","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 6
Abstract
The resource-constrained project scheduling problem involves the determination of a schedule of the project activities, satisfying the precedence relations and resource constraints while minimizing the project duration. In practice, activity durations may be subject to variability, such that a stochastic approach to the problem is more appropriate. We propose a methodology for the determination of a project execution policy and a vector of predictive activity starting times with the objective of minimizing a cost function that consists of the weighted expected activity starting time deviations and the penalties or bonuses associated with late or early project completion. In a computational experiment, we show that our procedure greatly outperforms existing algorithms described in the literature