N. Nopsiri, E. Samuel, Lee Chan Fong, Alxner Kalalo, Nicholas Moses, Agus Jayadi, Ding Yi
{"title":"Expanding the Envelopes of Openhole Gravel Packing in Sabah Deepwater Malaysia","authors":"N. Nopsiri, E. Samuel, Lee Chan Fong, Alxner Kalalo, Nicholas Moses, Agus Jayadi, Ding Yi","doi":"10.2523/iptc-22743-ms","DOIUrl":null,"url":null,"abstract":"\n Amongst the challenges encountered during infill drilling and completion is the requirement to penetrate depleted zones drained during the early phases of the field development. This condition is exacerbated for completions requiring openhole gravel pack as the maximum openhole lengths are traditionally limited by the effective circulating density experienced during the openhole drilling and gravel packing. This paper discusses the techniques implemented in four openhole gravel pack completions with openhole lengths up to 858m marking a new record for the longest openhole completed by PTTEP in this field. The wells were deployed by PTTEP in the Malaysian Deepwater Block K, during the field development of Siakap North Petai Phase 2, executed between Q4 2021 and Q1 2022.","PeriodicalId":283978,"journal":{"name":"Day 1 Wed, March 01, 2023","volume":"351 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-02-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 1 Wed, March 01, 2023","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2523/iptc-22743-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
Amongst the challenges encountered during infill drilling and completion is the requirement to penetrate depleted zones drained during the early phases of the field development. This condition is exacerbated for completions requiring openhole gravel pack as the maximum openhole lengths are traditionally limited by the effective circulating density experienced during the openhole drilling and gravel packing. This paper discusses the techniques implemented in four openhole gravel pack completions with openhole lengths up to 858m marking a new record for the longest openhole completed by PTTEP in this field. The wells were deployed by PTTEP in the Malaysian Deepwater Block K, during the field development of Siakap North Petai Phase 2, executed between Q4 2021 and Q1 2022.
在填充钻井和完井过程中遇到的挑战之一是,在油田开发的早期阶段,需要穿透枯竭的区域。这种情况在需要裸眼砾石充填的完井中更为严重,因为裸眼钻井和砾石充填期间的有效循环密度限制了裸眼最大长度。本文讨论了在4个裸眼砾石充填完井中实施的技术,裸眼长度达到858m,创造了PTTEP在该领域完成的最长裸眼的新纪录。这些井由PTTEP部署在马来西亚深水区块K,在Siakap North Petai第二期油田开发期间,于2021年第四季度至2022年第一季度执行。