PERENCANAAN DAN ANALISIS KELAYAKAN INVESTASI PROYEK PEMASANGAN KAPASITOR BANK PADA INSTALASI PEMANFAATAN ENERGI LISTRIK

Epiwardi Epiwardi, Ruwahyoto Ruwahyoto, Heri Sungkowo
{"title":"PERENCANAAN DAN ANALISIS KELAYAKAN INVESTASI PROYEK PEMASANGAN KAPASITOR BANK PADA INSTALASI PEMANFAATAN ENERGI LISTRIK","authors":"Epiwardi Epiwardi, Ruwahyoto Ruwahyoto, Heri Sungkowo","doi":"10.33795/ELTEK.V18I1.211","DOIUrl":null,"url":null,"abstract":"\n \n \nThe low power factor in the electricity installation of Sumber Wendit 3 water pumping stations causes a bill of excess reactive energy usage or kVARh, so that the cost of using electricity becomes higher. The excess use of reactive energy can be compensated by additional investment in installing capacitor banks in the main distribution panel (MDP) Sumber Wendit 3 water pump station. Based on the data and problems, it is planned to install capacitor banks that meet the standards with a target of 0.90 and 0.95 lagging. From the results of the planning, we need 150 kVAR and 250 kVAR capacitors, with an investment value of Rp. 94,983,790 and - Rp. 120,781,210. After an investment feasibility test using the Payback Period (PP) method, it is known that for a 150 kVAR bank capacitors, the investment return is technically 2.88 months and economically is 4.01 and 3.17 months. For 250 kVAR bank capacitors, the return on investment is technically 3.66 months and economically 5.1 and 4.03 months. When compared with the economic life of the investment is 10 years, the investment of the bank capacitor installation project is very profitable and feasible to carry out \n \n \n","PeriodicalId":403475,"journal":{"name":"Jurnal Teknik Ilmu Dan Aplikasi","volume":"4 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-04-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Teknik Ilmu Dan Aplikasi","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33795/ELTEK.V18I1.211","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The low power factor in the electricity installation of Sumber Wendit 3 water pumping stations causes a bill of excess reactive energy usage or kVARh, so that the cost of using electricity becomes higher. The excess use of reactive energy can be compensated by additional investment in installing capacitor banks in the main distribution panel (MDP) Sumber Wendit 3 water pump station. Based on the data and problems, it is planned to install capacitor banks that meet the standards with a target of 0.90 and 0.95 lagging. From the results of the planning, we need 150 kVAR and 250 kVAR capacitors, with an investment value of Rp. 94,983,790 and - Rp. 120,781,210. After an investment feasibility test using the Payback Period (PP) method, it is known that for a 150 kVAR bank capacitors, the investment return is technically 2.88 months and economically is 4.01 and 3.17 months. For 250 kVAR bank capacitors, the return on investment is technically 3.66 months and economically 5.1 and 4.03 months. When compared with the economic life of the investment is 10 years, the investment of the bank capacitor installation project is very profitable and feasible to carry out
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
策划和分析银行在电力利用设施安装电容项目的可行性投资
Sumber Wendit 3型水泵站的电力安装功率因数较低,导致无功能耗过高(kVARh),因此用电成本变得更高。无功能的过量使用可以通过在主配电板(MDP) Sumber Wendit 3泵站安装电容器组的额外投资来补偿。根据数据和问题,计划安装符合标准的电容器组,目标为滞后0.90和0.95。从规划结果来看,我们需要150kvar和250kvar的电容器,投资价值为Rp. 94,983,790和- Rp. 120,781,210。通过投资回收期(PP)法进行投资可行性测试,可知150kvar银行电容器的技术投资回报为2.88个月,经济投资回报为4.01个月和3.17个月。250kvar银行电容器的技术投资回报率为3.66个月,经济投资回报率为5.1个月,经济投资回报率为4.03个月。与投资10年的经济寿命相比,银行电容器安装项目的投资是非常有利可图的,并且是可行的
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
H2O ALGORITHM FOR JATROPHA CURCAS DISEASE IDENTIFICATION WITH FEATURE SELECTION USING GENETIC ALGORITHM PENERAPAN DESIGN THINKING DENGAN USABILITY TESTING MENGGUNAKAN SYSTEM USABILITY SCALE PADA ANTARMUKA APLIKASI ‘CURHAT’ PENERAPAN METODE WEIGHTED SUM MODEL PADA SISTEM SELEKSI SUPPLIER DI UD. SUMBER BESI BERBASIS WEB DESAIN DAN IMPLEMENTASI ANTENA MICROSTRIP ARRAY 8 ELEMEN PADA FREKUENSI 2,4 GHZ UNTUK MENUNJANG WIRELESS LOCAL AREA NETWORK ANALISIS PERPINDAHAN MASSA DAN UJI ORGANOLEPTIK PEMBUATAN NUGGET IKAN LAUT MENGGUNAKAN DEEP FAT FRYING
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1