Perspective Directions of Energy Saving Technologies in Distributed Power Generation

I. Rostuntsova, S. Novichkov, O. V. Zakharov
{"title":"Perspective Directions of Energy Saving Technologies in Distributed Power Generation","authors":"I. Rostuntsova, S. Novichkov, O. V. Zakharov","doi":"10.1109/URALCON.2018.8544292","DOIUrl":null,"url":null,"abstract":"The coal gasification in a fluidized bed under pressure, the circulating fluidized bed, the utilization of excess heat of exhaust gases after an exhaust boiler in the binary combined-cycle plant refer to the long-range energy saving solutions of the distributed power engineering. The calculation of technical and economic expediency of the technical re-equipping of a coal-dust power facility with moving to the scheme of a combined-cycle plant and with the implementation of the coal gasification in a fluidized bed under pressure is performed. The way of using additional exit-gas heat behind the recovery boiler system water heating and a chemically treated water of district heating makeup heating is offered. It leads to the production of the extra power by a steam turbine and improves the efficiency of binary combined-cycle cogeneration plant operation.","PeriodicalId":263504,"journal":{"name":"2018 International Ural Conference on Green Energy (UralCon)","volume":"15 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 International Ural Conference on Green Energy (UralCon)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/URALCON.2018.8544292","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The coal gasification in a fluidized bed under pressure, the circulating fluidized bed, the utilization of excess heat of exhaust gases after an exhaust boiler in the binary combined-cycle plant refer to the long-range energy saving solutions of the distributed power engineering. The calculation of technical and economic expediency of the technical re-equipping of a coal-dust power facility with moving to the scheme of a combined-cycle plant and with the implementation of the coal gasification in a fluidized bed under pressure is performed. The way of using additional exit-gas heat behind the recovery boiler system water heating and a chemically treated water of district heating makeup heating is offered. It leads to the production of the extra power by a steam turbine and improves the efficiency of binary combined-cycle cogeneration plant operation.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
分布式发电节能技术展望方向
煤炭加压流化床气化、循环流化床气化、双联循环电厂排烟锅炉后废气余热利用是分布式电力工程的长远节能解决方案。对某煤尘发电装置改造为联合循环装置方案并实施压力流化床气化的技术经济效益进行了计算。提出了在余热锅炉系统水加热和区域供热化学处理水后使用附加出口燃气热的方法。它使汽轮机产生多余的功率,提高了双联循环热电厂的运行效率。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Designing Database for Decision Support System for Development of Electrical Grid Design of Brushless Electric Machine with Axial Magnetic Flux Based on the Use of Nomograms Technical-Economic Assessment of Small Hydro-Power Units Features of Design and Operation of Wind-Diesel Complexes Evaluation of Ways to Improve the Energy Efficiency of Sites of First Rise Supply Water Systems with Storage Tank by Laboratory Modeling
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1