Fuzzy resource allocations in project management when insufficient resources are considered

C. Fu, H. Wang
{"title":"Fuzzy resource allocations in project management when insufficient resources are considered","authors":"C. Fu, H. Wang","doi":"10.1109/AFSS.1996.583615","DOIUrl":null,"url":null,"abstract":"This study proposes a fuzzy resource allocation model for project management in which a fuzzy relation on resource needs and a budget limit are described. The model can be solved in the form of crisp linear programming (LP) with /spl alpha/-cut. Despite the delivery routes of the teams, the results can express whether the project has sufficient or insufficient resources resulting from each activity.","PeriodicalId":197019,"journal":{"name":"Soft Computing in Intelligent Systems and Information Processing. Proceedings of the 1996 Asian Fuzzy Systems Symposium","volume":"146 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1996-12-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"21","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Soft Computing in Intelligent Systems and Information Processing. Proceedings of the 1996 Asian Fuzzy Systems Symposium","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/AFSS.1996.583615","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 21

Abstract

This study proposes a fuzzy resource allocation model for project management in which a fuzzy relation on resource needs and a budget limit are described. The model can be solved in the form of crisp linear programming (LP) with /spl alpha/-cut. Despite the delivery routes of the teams, the results can express whether the project has sufficient or insufficient resources resulting from each activity.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
考虑资源不足时项目管理中的模糊资源分配
本文提出了一个用于项目管理的模糊资源分配模型,该模型描述了资源需求和预算限制之间的模糊关系。该模型可以用/spl alpha/-cut的清晰线性规划(LP)形式求解。不管团队的交付路线如何,结果都可以表示项目是否有足够的或不足的资源来自于每个活动。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Supporting rough set theory in very large databases using oracle RDBMS Theory of including degrees and its applications to uncertainty inferences Fuzzy decision making through relationships analysis between criteria Stratification structures on a kind of completely distributive lattices and their applications in theory of topological molecular lattices Supporting consensus reaching under fuzziness via ordered weighted averaging (OWA) operators
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1