{"title":"Multistage Active Distribution Network Integrated Planning Incorporating Energy Storage Systems and Active Network Management","authors":"Milad Kabirifar, M. Fotuhi‐Firuzabad, M. Moeini‐Aghtaie, Niloofar Pourghaderi","doi":"10.1109/IEPS51250.2020.9263121","DOIUrl":null,"url":null,"abstract":"Active distribution network (ADN) expansion planning by modeling network active management is addressed in this paper. In this regard the expansion of distributed energy resources (DERs) and distribution network assets are jointly planned. In the proposed model active management is applied to efficiently utilize the DERs in the planning problem and alleviated the uncertainties. In this paper energy storage systems (ESSs) as an important DER are utilized in active management framework. To model active management of the network, based on load and renewable energy resources’ behavior, some operating levels are regarded for each planning time stage. The objective is to minimize the net present worth of investment, maintenance and operation costs for all planning stages and operating levels. As the problem is solved the expansion plans of network alternatives including feeders, transformers, and substations as long as DERs including micro turbines, wind turbines and ESSs are extracted. Furthermore, the optimal operations of the network and DERs are obtained through the operating levels. Associated uncertainties are considered using a correlated scenario based approach. The problem is mathematically modeled in the form of mixed integer linear programming (MILP).","PeriodicalId":235261,"journal":{"name":"2020 IEEE 4th International Conference on Intelligent Energy and Power Systems (IEPS)","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2020-09-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2020 IEEE 4th International Conference on Intelligent Energy and Power Systems (IEPS)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IEPS51250.2020.9263121","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

Active distribution network (ADN) expansion planning by modeling network active management is addressed in this paper. In this regard the expansion of distributed energy resources (DERs) and distribution network assets are jointly planned. In the proposed model active management is applied to efficiently utilize the DERs in the planning problem and alleviated the uncertainties. In this paper energy storage systems (ESSs) as an important DER are utilized in active management framework. To model active management of the network, based on load and renewable energy resources’ behavior, some operating levels are regarded for each planning time stage. The objective is to minimize the net present worth of investment, maintenance and operation costs for all planning stages and operating levels. As the problem is solved the expansion plans of network alternatives including feeders, transformers, and substations as long as DERs including micro turbines, wind turbines and ESSs are extracted. Furthermore, the optimal operations of the network and DERs are obtained through the operating levels. Associated uncertainties are considered using a correlated scenario based approach. The problem is mathematically modeled in the form of mixed integer linear programming (MILP).
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
结合储能系统和主动网络管理的多级主动配电网综合规划
本文研究了基于网络主动管理模型的主动配电网扩展规划问题。为此,联合规划分布式能源(DERs)和配电网资产的扩张。该模型采用主动管理的方法,有效地利用了规划问题中的需求因子,减轻了规划问题中的不确定性。本文将储能系统作为一种重要的分布式电源应用于主动管理框架。为了建立电网主动管理模型,基于负荷和可再生能源的行为,在每个规划时间阶段考虑一定的运行水平。目标是在所有规划阶段和操作水平上最小化投资、维护和操作成本的净现值。随着问题的解决,只要提取包括微型涡轮机、风力涡轮机和ess在内的der,就可以得到包括馈线、变压器和变电站在内的电网替代方案的扩建计划。在此基础上,通过操作层次得到网络的最优操作和der。使用基于相关情景的方法来考虑相关的不确定性。该问题以混合整数线性规划(MILP)的形式进行数学建模。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Optimal Placement of Actuator for Vibration Suppression Based on Intelligent PID Controller Investigation of power switched reluctance drive as a traction one for shunting locomotives Control and power supply device for nanosecond EMP generator Selection an Effective Implementation of a Multiphase Isolated DC-DC Converter Theoretical Analysis of Optical Properties of CdS/CdTe Film Heterosystems
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1