Working robots for nuclear power plant desasters

M. Sugisaka
{"title":"Working robots for nuclear power plant desasters","authors":"M. Sugisaka","doi":"10.1109/DEST.2011.5936593","DOIUrl":null,"url":null,"abstract":"This document presents the exiting robots that are used in both American army in the operation of Iraq and Afghanistan and Japanese rescue teams formed after The Great Hanshin-Awaji Earthquake (1/17, 1955, 5:46:52 a.m. Magnitude 7.3). This document gives how some of existing robots could be used to survey the damaged Fukushima Dai-ichi nuclear power plant after East Japan Earthquake (3/11, 2011, 2:46:18 p.m. Magnitude 9.0, The largest domestic record) and Tsunami (10 m)","PeriodicalId":297420,"journal":{"name":"5th IEEE International Conference on Digital Ecosystems and Technologies (IEEE DEST 2011)","volume":"68 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2011-06-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"21","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"5th IEEE International Conference on Digital Ecosystems and Technologies (IEEE DEST 2011)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/DEST.2011.5936593","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 21

Abstract

This document presents the exiting robots that are used in both American army in the operation of Iraq and Afghanistan and Japanese rescue teams formed after The Great Hanshin-Awaji Earthquake (1/17, 1955, 5:46:52 a.m. Magnitude 7.3). This document gives how some of existing robots could be used to survey the damaged Fukushima Dai-ichi nuclear power plant after East Japan Earthquake (3/11, 2011, 2:46:18 p.m. Magnitude 9.0, The largest domestic record) and Tsunami (10 m)
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
核电站灾难处理机器人
这份文件介绍了美军在伊拉克和阿富汗作战中使用的机器人,以及日本阪神-淡路大地震(1955年1月17日,上午5:46:52)后组建的救援队中使用的机器人。7.3级)。这个文件给出了一些现有的机器人如何在东日本地震后被用来调查受损的福岛第一核电站。里氏9.0级(国内最高记录)和海啸(10米)
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Innovation adoption forum for industry and public sector Global path planning using improved ant colony optimization algorithm through bilateral cooperative exploration Double burst error correction method: Case of interference incidents during data transmission in wired channels Overview of cognitive visualisation Interval type-2 fuzzy logic controllers for flocking behavior
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1