Post Commission Grid Impact Assessment of a 20 MWp Solar PV Grid Connected System on the ECG 33 kV Network in Winneba

Ekow Appiah Kwofie, Godfred Mensah, Vincent Safo Antwi
{"title":"Post Commission Grid Impact Assessment of a 20 MWp Solar PV Grid Connected System on the ECG 33 kV Network in Winneba","authors":"Ekow Appiah Kwofie, Godfred Mensah, Vincent Safo Antwi","doi":"10.1109/PowerAfrica.2019.8928841","DOIUrl":null,"url":null,"abstract":"This paper summarizes the results of a post grid impact assessment of a Distributed Generated 20 MWp Solar PV plant on a 33-kV interconnection bus of a 161/33 kV substation within the Electricity Company of Ghana’s Limited distribution network located in the Gomoa Onyadze community in the Central Region of Ghana. The PV plant was commissioned since 2015. The paper assesses the impact of the PV plant in the following areas: The Demand Profile; Power Factor at the Point of Common Coupling (PCC); The Voltage Total Harmonic Distortion at the PCC; The Current Total Harmonic Distortion at the PCC; and the Voltage Profile at the PCC. The load profile was significantly distorted due to the active generation of the solar PV Plant. It now assumes a duck shape. The power factor at the 33 kV PCC bus deteriorated within the periods of active solar PV generation from 7:00 hours to 19:00 hours and went as low as 0.187 at noon time. The Voltage Total Harmonic Distortion (THD V) Levels at the 33 kV PCC bus where the solar PV Plant is interconnected, far exceeded the ECG allowable limits for THD V of 3%. The values were as high as 10%. The Current Total Harmonic Distortion (THD A) Levels at the 33 kV PCC bus of Transformer 1 far exceeded the limits of THD A of 5%. The values were as high as 65%. There was no significant impact on the voltage profile at the 33-kV bus where the solar PV plant was interconnected.","PeriodicalId":308661,"journal":{"name":"2019 IEEE PES/IAS PowerAfrica","volume":"56 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2019 IEEE PES/IAS PowerAfrica","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PowerAfrica.2019.8928841","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

Abstract

This paper summarizes the results of a post grid impact assessment of a Distributed Generated 20 MWp Solar PV plant on a 33-kV interconnection bus of a 161/33 kV substation within the Electricity Company of Ghana’s Limited distribution network located in the Gomoa Onyadze community in the Central Region of Ghana. The PV plant was commissioned since 2015. The paper assesses the impact of the PV plant in the following areas: The Demand Profile; Power Factor at the Point of Common Coupling (PCC); The Voltage Total Harmonic Distortion at the PCC; The Current Total Harmonic Distortion at the PCC; and the Voltage Profile at the PCC. The load profile was significantly distorted due to the active generation of the solar PV Plant. It now assumes a duck shape. The power factor at the 33 kV PCC bus deteriorated within the periods of active solar PV generation from 7:00 hours to 19:00 hours and went as low as 0.187 at noon time. The Voltage Total Harmonic Distortion (THD V) Levels at the 33 kV PCC bus where the solar PV Plant is interconnected, far exceeded the ECG allowable limits for THD V of 3%. The values were as high as 10%. The Current Total Harmonic Distortion (THD A) Levels at the 33 kV PCC bus of Transformer 1 far exceeded the limits of THD A of 5%. The values were as high as 65%. There was no significant impact on the voltage profile at the 33-kV bus where the solar PV plant was interconnected.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Winneba市20mwp太阳能光伏并网系统在33kv电网上的并网影响评估
本文总结了位于加纳中部地区Gomoa Onyadze社区的加纳电力有限公司配电网内的161/33千伏变电站的33千伏互连总线上的分布式发电20兆瓦太阳能光伏电站的电网后影响评估结果。该光伏电站于2015年投入使用。本文评估了光伏电站在以下方面的影响:需求概况;共耦合点功率因数;PCC处电压总谐波畸变的研究PCC电流总谐波畸变的研究以及PCC的电压分布图。由于太阳能光伏电站的主动发电,负载分布明显扭曲。现在它呈鸭形。33 kV PCC母线功率因数在太阳能光伏主动式发电时段(7:00 ~ 19:00)逐渐恶化,中午时低至0.187。在太阳能光伏电站连接的33kv PCC总线上,电压总谐波失真(THD V)水平远远超过了ECG允许的THD V 3%的限制。数值高达10%。变压器1的33 kV PCC母线电流总谐波失真(THD A)水平远远超过5%的THD A限值。该数值高达65%。对太阳能光伏电站连接的33千伏母线的电压分布没有显著影响。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Modeling, Analysis of Current Trajectories of a Nine Phase Induction Machine for Regenerative Capabilities A Model Algorithm for Smart Power Supply and Distribution in Residential Building REPLAN: Multi-Region Power System Planning Approach for Nigeria Eddy current losses computation in conductives materials: case of Aluminum and Permanent Magnet-Part I: Frequency and current effects Performance Analysis of Fuzzy Logic Maximum Power Point Tracking Scheme for Solar PV System Under Varying Load and Atmospheric Conditions
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1