Pilot workload during final approach in congested airspace

S. Hart
{"title":"Pilot workload during final approach in congested airspace","authors":"S. Hart","doi":"10.1109/CDC.1978.268137","DOIUrl":null,"url":null,"abstract":"Time estimation has been proposed as a measure of pilot workload and it appears that the production method provides a useful measure. The verbal estimation method has also been investigated and it appears that it does not provide as sensitive a measure of workload as does the production method. Verbal estimates are given with less precision and a series of verbal estimates tends to reflect a relative judgement of the duration of different intervals rather than an absolute judgement of the length of each interval. Overestimation may either reflect boredom during the interval, or the fact that a great deal of activity was performed during the interval that was remembered. Underestimation may either reflect a feeling that time passed quickly because interesting activities were engaged in, or that so little activity was performed or remembered, that very little time passed.","PeriodicalId":375119,"journal":{"name":"1978 IEEE Conference on Decision and Control including the 17th Symposium on Adaptive Processes","volume":"84 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"1978 IEEE Conference on Decision and Control including the 17th Symposium on Adaptive Processes","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CDC.1978.268137","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

Time estimation has been proposed as a measure of pilot workload and it appears that the production method provides a useful measure. The verbal estimation method has also been investigated and it appears that it does not provide as sensitive a measure of workload as does the production method. Verbal estimates are given with less precision and a series of verbal estimates tends to reflect a relative judgement of the duration of different intervals rather than an absolute judgement of the length of each interval. Overestimation may either reflect boredom during the interval, or the fact that a great deal of activity was performed during the interval that was remembered. Underestimation may either reflect a feeling that time passed quickly because interesting activities were engaged in, or that so little activity was performed or remembered, that very little time passed.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
在拥挤空域最后进近时飞行员的工作量
时间估计已被提出作为试点工作量的衡量标准,而生产方法似乎提供了一个有用的衡量标准。也对口头估计方法进行了调查,它似乎不能像生产方法那样灵敏地衡量工作量。口头估计的精确度较低,一系列口头估计往往反映了对不同间隔持续时间的相对判断,而不是对每个间隔长度的绝对判断。过高估计可能反映了间隔期间的无聊,或者是在间隔期间进行了大量被记住的活动的事实。低估可能反映了一种感觉,即时间过得很快,因为参与了有趣的活动,或者进行或记住的活动很少,所以时间过得很少。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Properties of the system matrix of a generalized state-space system A gradient technique for general buffer storage design in a production line State estimation under uncertain observations with unknown statistics Perturbation of controllable systems Rates of convergence for conditional gradient algorithms near singular and nonsingular extremals
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1