ANALISIS BIAYA ELEMENTAL UNTUK PERENCANAAN BIAYA PROYEK APARTEMEN

Meidy Kempa, Andi Andi, Lie Arijanto
{"title":"ANALISIS BIAYA ELEMENTAL UNTUK PERENCANAAN BIAYA PROYEK APARTEMEN","authors":"Meidy Kempa, Andi Andi, Lie Arijanto","doi":"10.9744/DUTS.1.1.27-35","DOIUrl":null,"url":null,"abstract":"Apartment’s project cost planning involves a Quantity Surveyor to determine the target cost (budget) for the owner. Target cost must included all elements of the existing building. This study aims to determine the format and price range of each building element in the elemental cost analysis for apartment’s project cost planning.The data were obtained by looking at historical data of the middle class  apartment’s projects Bill of Quantity in area of Surabaya, Solo and Semarang with reference to the format NPWC List of Elements, Australia.The results of the data analysis showed that the format of building elements that can be used in elemental cost analysis consists of 11 major elements are Preliminaries, Sub-structure, Super-structure, Finishes, Fittings, Services, Site Works, External Services, Waterproofing, Grills & Iron, and Pool. While the price range of elements in the elemental cost analysis showed that the apartment’s project which has a basement, the price difference is 20-30% larger than projects that do not have a basement. For the project which has storey height ≥ 3m, the price difference is 3.5-20% larger than projects which has storey height < 3m. For projects which has a basement & storey height ≥ 3m, the price difference is 30% larger than the project which has a basement & storey height <3m. Keyword : cost planning, target cost, apartment’s project, building elements, elemental cost analysis","PeriodicalId":187066,"journal":{"name":"Dimensi Utama Teknik Sipil","volume":"68 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-10-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Dimensi Utama Teknik Sipil","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.9744/DUTS.1.1.27-35","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Apartment’s project cost planning involves a Quantity Surveyor to determine the target cost (budget) for the owner. Target cost must included all elements of the existing building. This study aims to determine the format and price range of each building element in the elemental cost analysis for apartment’s project cost planning.The data were obtained by looking at historical data of the middle class  apartment’s projects Bill of Quantity in area of Surabaya, Solo and Semarang with reference to the format NPWC List of Elements, Australia.The results of the data analysis showed that the format of building elements that can be used in elemental cost analysis consists of 11 major elements are Preliminaries, Sub-structure, Super-structure, Finishes, Fittings, Services, Site Works, External Services, Waterproofing, Grills & Iron, and Pool. While the price range of elements in the elemental cost analysis showed that the apartment’s project which has a basement, the price difference is 20-30% larger than projects that do not have a basement. For the project which has storey height ≥ 3m, the price difference is 3.5-20% larger than projects which has storey height < 3m. For projects which has a basement & storey height ≥ 3m, the price difference is 30% larger than the project which has a basement & storey height <3m. Keyword : cost planning, target cost, apartment’s project, building elements, elemental cost analysis
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
公寓计划成本的元素成本分析
公寓项目的成本计划包括一个工料测量师来为业主确定目标成本(预算)。目标成本必须包括现有建筑的所有元素。本研究旨在确定公寓项目成本规划中要素成本分析中每个建筑要素的形式和价格范围。这些数据是通过查看泗水、索罗和三宝垄地区中产阶级公寓项目的工程量清单的历史数据获得的,参考了澳大利亚NPWC元素列表的格式。数据分析结果表明,可用于要素成本分析的建筑要素格式包括11个主要要素,分别是基础设施、子结构、上层结构、饰面、配件、服务、现场工程、外部服务、防水、烤架和铁以及游泳池。虽然元素成本分析中的要素价格范围显示,有地下室的公寓项目的价格差异比没有地下室的项目大20-30%。层高≥3米的项目,比层高< 3米的项目差价大3.5-20%。地下室≥3米的工程,其差价比地下室<3米的工程大30%。关键词:成本计划,目标成本,公寓项目,建筑要素,要素成本分析
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
OPTIMASI FLUKTUASI RESOURCE PADA PROYEK PERUMAHAN X YANG MENGGUNAKAN METODE PENJADWALAN LINE OF BALANCE DENGAN ALGORITMA SYMBIOTIC ORGANISMS SEARCH PENGARUH MANAJEMEN MODAL KERJA TERHADAP PROFITABILITAS PERUSAHAAN JASA KONSTRUKSI PUBLIK DI INDONESIA PERIODE 2018-2022 FAKTOR-FAKTOR DALAM MEMBENTUK HARGA PROPERTI DI SURABAYA PENGARUH PANDEMI TERHADAP PROFITABILITAS PERUSAHAAN BAJA PENGARUH PANDEMI COVID-19 TERHADAP PERFORMA FINANSIAL PADA PERUSAHAAN PROPERTI, KONSTRUKSI DAN REAL ESTATE YANG TERDAFTAR DI BURSA EFEK INDONESIA
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1