Cross-Border Transmission Line Configuration Influence on the Electrical Power and Energy Billing Process

K. Dobrzyński, J. Klucznik, Z. Lubośny, M. Jaskólski, P. Bućko
{"title":"Cross-Border Transmission Line Configuration Influence on the Electrical Power and Energy Billing Process","authors":"K. Dobrzyński, J. Klucznik, Z. Lubośny, M. Jaskólski, P. Bućko","doi":"10.1109/EEM.2018.8469863","DOIUrl":null,"url":null,"abstract":"In 2015 a connection between the Polish and Lithuanian power systems become fully operational. The connection consists of a 400 kV double circuit transmission line and a back-to-back HVDC substation located on the Lithuanian side. A magnetic couplings between the circuits of the transmission line cause that during power transmission a different values of active power losses are observed in both circuits. This situation may cause a financial settlement problems for transmitted energy between the operators of the connected systems.","PeriodicalId":334674,"journal":{"name":"2018 15th International Conference on the European Energy Market (EEM)","volume":"18 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 15th International Conference on the European Energy Market (EEM)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EEM.2018.8469863","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

In 2015 a connection between the Polish and Lithuanian power systems become fully operational. The connection consists of a 400 kV double circuit transmission line and a back-to-back HVDC substation located on the Lithuanian side. A magnetic couplings between the circuits of the transmission line cause that during power transmission a different values of active power losses are observed in both circuits. This situation may cause a financial settlement problems for transmitted energy between the operators of the connected systems.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
跨境输电线路配置对电力和能源计费过程的影响
2015年,波兰和立陶宛电力系统之间的连接将全面投入运行。该连接包括一条400千伏双回传输线和位于立陶宛一侧的背靠背高压直流变电站。传输线回路之间的磁耦合导致在电力传输过程中,在两个回路中观察到不同的有功功率损耗值。这种情况可能会导致连接系统运营商之间传输能量的财务结算问题。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Fast Frequency Control Services in Europe Development of the Polish Power Exchange as a Management System in Terms of Control Theory and Systems Engineering Are Consumption Tariffs Still Up-to-Date? an Operationalized Assessment of Grid Fees Enhancing N -1 Security via Building Thermostatic Load Control Strategy Improvement of DC Microgrid Voltage Regulation Based on Bidirectional Intelligent Charging Systems
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1