An Analysis of the Effects of Metropolitan Railway and Highway Infrastructure Accessibility on the Occurrence of Building Construction : The Case of Gangnam Station Area and Hinterlands
{"title":"An Analysis of the Effects of Metropolitan Railway and Highway Infrastructure Accessibility on the Occurrence of Building Construction : The Case of Gangnam Station Area and Hinterlands","authors":"Hyun-kyung Kang, Seung-Yeong Go, Seungil Lee","doi":"10.17208/jkpa.2022.12.57.7.55","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":139926,"journal":{"name":"Journal of Korea Planning Association","volume":"192 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-12-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Korea Planning Association","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.17208/jkpa.2022.12.57.7.55","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}